fabsurplus.com

TERADYNE IP750EX AUTOMATED TEST EQUIPMENT For CMOS Image Sensor testing for Sale


SDI fabsurplus.com is pleased to announce the availability of the following listed used TERADYNE IP750EX AUTOMATED TEST EQUIPMENT For CMOS Image Sensor testing.
Please click on the "Get Quote" button at the end of the IP750EX description, if you'd like to get a quotation, photos and specifications of this AUTOMATED TEST EQUIPMENT For CMOS Image Sensor testing, and your request for this equipment will be forwarded to our SDI sales representatives automatically.
This TERADYNE IP750EX AUTOMATED TEST EQUIPMENT For CMOS Image Sensor testing is available for immediate sale.
Crating, refurbishment and delivery for this equipment can be quoted on request.


TERADYNE IP750EX Equipment Details

SDI ID: 108607
Manufacturer: TERADYNE
Model: IP750EX
Description: AUTOMATED TEST EQUIPMENT For CMOS Image Sensor testing
Version: TEST
Vintage: 01.06.2012
Quantity: 1
Sales Condition: as is where is
Lead Time: immediately
Sales Price: Inquire
Comments:

Equipment stored in warehouse. Inspection available upon request.

Please check the pictures below for more information.

The system is sold including the Nikon N-SIS V Illuminator, as shown in the photos.

Attached below is a full listing of the system configuration, and diagnostics report. These reports are also attached in a PDF file.

Test System for High-Speed, High-Quality Image Sensor Test
Characteristics:
-High performance/ high throughput.
-Low cost of test.
-high parallel test efficiency
-wide-ranging device test coverage from CCD and CIS, analog and digital capture, and concurrent image sensor and logic testing.--TeradyneIG-XL software environment allows fast test program development and easy maintenance.

APPLICATIONS

Still and Movie Cameras
    Smartphones and Media Tablets
    DSC cameras
    Security cameras
    Scanning imagery
    Space satellite cameras
Image Detecting Devices
    Automotive safety
    Sensors for body scanners
    X-rays
    Infrared thermograph
    Scanning imagery

ADVANTAGES
High Throughput
    Powerful CPU for image data processing for high pixel resolution device
    High speed data transfer at 40Gbps per instrument parallel
    Up to 96 sites in parallel test with 16 slot test head
    The highest parallelism with high parallel test efficiency.

Broad Device Coverage - up to 128M Pixels

    High versatility for testing a broad range of devices – VGA to 32M pixels with ICUA analog capture and MIPI LVDS capture capability using ICMD
    With custom LVDS protocol coverage
    SoC test capability with digital instrument for SoC type image sensor

Single Platform

    Built on Teradyne’s J750 test platform
    IP750 series can be upgraded on-site to IP750Ex-HD or J750Ex-HD.

Test Program Compatibility

    IP750EP/EMP test programs can run on IP750Ex/Ex-HD with minor conversion

IG-XL Software

CONFIGURATIONS
IP750Ex

    32 site system capable for wafer test
    ICMD 1.5Gbps MIPI D-Phy  image capture instrument
    Custom LVDS capture capability with ICMD
    ICUA2 up to 100MHz analog image capture instrument
    ICUD200 200MHz 32M pixel / Channel 24 bit depth/pixel
    HSD200 200MHz Digital instrument
    HDDPS 24/48Ch DC source
    20Gbps image data transfer 
    110mm diameter illuminator support

 

%JOB_START - Beginning CUB Calibration test on slot 18 at 11:29:14 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting Channel Drive Levels: Vih Vil

- Starting Channel Compare Levels: Voh Vol

- Finished Channel Calibration

 

%JOB_END - ****PASSED**** CUB Calibration of slot 18 (S/N:) at 11:29:14 AM

 

%JOB_START - Beginning Channel_Board_DIB Calibration test on slot(s) 0,1 at 11:29:27 AM on

1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting DC Calibration on slot 0

- Systemwide functionality and continuity to slot 0

- Starting dib_test

- Temperature at PE Ch00 is 38 deg C

- Temperature at PE Ch60 is 37 deg C

- Temperature at TG Ch60 is 26 deg C

- Temperature at TG Ch00 is 48 deg C

- Starting BPMU Force Voltage

- Starting Bpmu Clamp Voltage

- Starting Bpmu Measure Voltage

- Starting Bpmu Measure Current

- Starting Bpmu Force current

- Starting Bpmu Limit current

- Starting Channel Drive Levels: Vih Vil

- Starting Channel Drive Levels: VT50ohm

- Starting Channel Compare Levels: Voh Vol

- Starting Channel Clamps: Vch Vcl

- Starting Channel Loads: Ioh Iol

- Starting Channel Load Threshold: Vt

- Starting HV Channel Drive Levels

- Starting HV Channel Drive Current

- Starting FHV Channel Drive Levels

- Ppmu Mi Warmup 11:31:34 AM

- Ppmu Mi Warmup 11:31:34 AM

- Starting Ppmu Force Voltage

- Starting Ppmu Measure Voltage

- Starting Ppmu Force Current Ppmu Force 200ua

- Starting Ppmu Force Current Ppmu Force 2ma

- Starting Ppmu Force Current Ppmu Force 50ma

- Starting Ppmu Force Current Ppmu Force 20ua

- Starting Ppmu Measure 2ma

- Continuing Ppmu Measure Current chan 15

- Continuing Ppmu Measure Current chan 31

- Continuing Ppmu Measure Current chan 47

- Continuing Ppmu Measure Current chan 63

- Starting Ppmu Measure 200ua

- Continuing Ppmu Measure Current chan 15

- Continuing Ppmu Measure Current chan 31

- Continuing Ppmu Measure Current chan 47

- Continuing Ppmu Measure Current chan 63

- Starting Ppmu Measure 20ua

- Continuing Ppmu Measure Current chan 15

- Continuing Ppmu Measure Current chan 31

- Continuing Ppmu Measure Current chan 47

- Continuing Ppmu Measure Current chan 63

- Starting Ppmu Measure 2ua

- Continuing Ppmu Measure Current chan 15

- Continuing Ppmu Measure Current chan 31

- Continuing Ppmu Measure Current chan 47

- Continuing Ppmu Measure Current chan 63

- Starting Ppmu Measure 50ma

- Continuing Ppmu Measure Current chan 15

- Continuing Ppmu Measure Current chan 31

- Continuing Ppmu Measure Current chan 47

- Continuing Ppmu Measure Current chan 63

- Finished Channel Calibration

- Finished DC Calibration on slot 0

- Starting DC Calibration on slot 1

- Systemwide functionality and continuity to slot 1

- Starting dib_test

- Temperature at PE Ch00 is 36 deg C

- Temperature at PE Ch60 is 36 deg C

- Temperature at TG Ch60 is 25 deg C

- Temperature at TG Ch00 is 45 deg C

- Starting BPMU Force Voltage

- Starting Bpmu Clamp Voltage

- Starting Bpmu Measure Voltage

- Starting Bpmu Measure Current

- Starting Bpmu Force current

- Starting Bpmu Limit current

- Starting Channel Drive Levels: Vih Vil

- Starting Channel Drive Levels: VT50ohm

- Starting Channel Compare Levels: Voh Vol

- Starting Channel Clamps: Vch Vcl

- Starting Channel Loads: Ioh Iol

- Starting Channel Load Threshold: Vt

- Starting HV Channel Drive Levels

- Starting HV Channel Drive Current

- Starting FHV Channel Drive Levels

- Ppmu Mi Warmup 11:37:11 AM

- Ppmu Mi Warmup 11:37:11 AM

- Starting Ppmu Force Voltage

- Starting Ppmu Measure Voltage

- Starting Ppmu Force Current Ppmu Force 200ua

- Starting Ppmu Force Current Ppmu Force 2ma

- Starting Ppmu Force Current Ppmu Force 50ma

- Starting Ppmu Force Current Ppmu Force 20ua

- Starting Ppmu Measure 2ma

- Continuing Ppmu Measure Current chan 79

- Continuing Ppmu Measure Current chan 95

- Continuing Ppmu Measure Current chan 111

- Continuing Ppmu Measure Current chan 127

- Starting Ppmu Measure 200ua

- Continuing Ppmu Measure Current chan 79

- Continuing Ppmu Measure Current chan 95

- Continuing Ppmu Measure Current chan 111

- Continuing Ppmu Measure Current chan 127

- Starting Ppmu Measure 20ua

- Continuing Ppmu Measure Current chan 79

- Continuing Ppmu Measure Current chan 95

- Continuing Ppmu Measure Current chan 111

- Continuing Ppmu Measure Current chan 127

- Starting Ppmu Measure 2ua

- Continuing Ppmu Measure Current chan 79

- Continuing Ppmu Measure Current chan 95

- Continuing Ppmu Measure Current chan 111

- Continuing Ppmu Measure Current chan 127

- Starting Ppmu Measure 50ma

- Continuing Ppmu Measure Current chan 79

- Continuing Ppmu Measure Current chan 95

- Continuing Ppmu Measure Current chan 111

- Continuing Ppmu Measure Current chan 127

- Finished Channel Calibration

- Finished DC Calibration on slot 1

 

%JOB_END - ****PASSED**** Channel_Board_DIB Calibration of slot(s) 0, 1 at 11:40:41 AM

- PASS slot 0 (S/N )

- PASS slot 1 (S/N )

 

%JOB_START - Beginning DPS_DIB Calibration test on slot 22 at 11:40:54 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting DPS Calibration on slot 22

 

- Calibrating DPS Voltage on slot 22

- Calibrating DPS Current Limit on slot 22

- Calibrating DPS Current Measure (50uA Range) on slot 22

- Calibrating DPS Current Measure (500uA Range) on slot 22

- Calibrating DPS Current Measure (10mA Range) on slot 22

- Calibrating DPS Current Measure (100mA Range) on slot 22

- Calibrating DPS Current Measure (1A Range) on slot 22

 

- Finished DPS Calibration on slot 22

 

 

%JOB_END - ****PASSED**** DPS_DIB Calibration of slot 22 (S/N:) at 11:41:17 AM

 

%JOB_START - Beginning APMU Calibration test on slot 5 at 11:41:30 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting APMU IDPROM test

- APMU Mother Board - P/N:51740001 Rev:1012A S/N:

- APMU Relay Board - P/N:51740200 Rev:2060 S/N:

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- Completed APMU IDPROM test

-

- Starting APMU Calibration on slot 5

 

 

- Completed APMU Calibration on slot 5

 

 

%JOB_END - ****PASSED**** APMU Calibration of slot 5 (S/N:4) at 11:43:48 AM

 

%JOB_START - Beginning ICUA Calibration test on slot 2 at 11:44:01 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting dib_test

- ICUA-2 P/N:51742601 Rev:738B S/N:4

- %INFO -- ADM on ICUA-2 Chan0 Slot2, ADM P/N:51740520 Rev:735C S/N:4

- %INFO -- ADM on ICUA-2 Chan1 Slot2, ADM P/N:51740520 Rev:735C S/N:4

- %INFO -- ADM on ICUA-2 Chan2 Slot2, ADM P/N:51740520 Rev:735C S/N:4

- %INFO -- ADM on ICUA-2 Chan3 Slot2, ADM P/N:51740520 Rev:735C S/N:4

- ICUA-2 Relay board P/N:51742800 Rev:515C S/N:4

- [ICUA Reference DAC Calibration]

- [ADM Range Calibration]

- - CDS Cal for AD9101

- - ICUA Chan 8 - (up to 1 min)

- - ICUA Chan 9 - (up to 1 min)

- - ICUA Chan 10 - (up to 1 min)

- - ICUA Chan 11 - (up to 1 min)

- [ADM DAC's Calibration]

- - ICUA Chan 8 -

- - ICUA Chan 9 -

- - ICUA Chan 10 -

- - ICUA Chan 11 -

- [Line Clamp Calibration]

- - ICUA Chan 8 -

- - ICUA Chan 8 -

- - ICUA Chan 9 -

- - ICUA Chan 9 -

- - ICUA Chan 10 -

- - ICUA Chan 10 -

- - ICUA Chan 11 -

- - ICUA Chan 11 -

- Complete ICUA Calibration 154.9 sec

 

%JOB_END - ****PASSED**** ICUA Calibration of slot 2 (S/N:4) at 11:46:36 AM

 

%JOB_START - Beginning AC Calibration at 11:46:48 AM on 1/17/2020 in High Accuracy Mode

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Beginning Digital Channel Timing Calibration

- Building List of Digital Channels

- Checking CalDIB AC Continuity for all Digital Channels

- Calibrating Super Linear Interpolator (SLI)

- Measuring Cub Round Trip Delay

- Measuring RF Matrix Delay

- Calibrating Drive Edges

- Calibrating Receive Edges

- Calibrating Receive Window

- Calibrating HFMux

- Calibrating Mux Drive

- Calibrating Receive Mux

- Completed Digital Channel Timing Calibration

 

 

%JOB_END - ****PASSED**** AC Calibration at 11:49:40 AM

 

- Writing to System Calibration file - Begin (up to 5 minutes)

- Writing to System Calibration file – End

 

%JOB_START - Beginning ICUL1G Quick Check test on slot 16 at 12:39:25 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 (P5) DIB:

P/N 51745600 S/N Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_(IP750EX)

%INFO - IG-XL 3.50.40IP02 (P5), Build: 10.23.14.08.52

%INFO - Maintenance Not installed,

%INFO - -----------------------------------------------------------------------

- Started ICUL1G test on slot 16

- Started ICUL1G Board IDPROM Test...

- ICUL1G Mother Board - P/N:51746301 Rev:1114A S/N:

- ICUL1G Rider Board - P/N:51746400 Rev:1039A S/N:

- Completed ICUL1G Board IDPROM Test.

 

- Active Device Set: HighSpeed1.1.1

 

- Started ICUL1G Temperature Test...

- ICUL1G Board TempSensor0 Temperature: 30.5 degrees C

- ICUL1G Board TempSensor1 Temperature: 30.5 degrees C

- ICUL1G Board TempSensor2 Temperature: 28.0 degrees C

- ICUL1G Board TempSensor3 Temperature: 32.0 degrees C

- ICUL1G Board TempSensor4 Temperature: 23.0 degrees C

- Completed ICUL1G Temperature Test.

 

- Started ICUL1G POL Test...

- Completed ICUL1G POL Test.

 

- Started ICUL1G FPGA Rev. Test...

- Misc FPGA Rev : 0xE

- Misc FPGA Firmware Rev : 0x34

- Channel FPGA Rev : 0x22

- Infiniband FPGA Rev : 0xD

- Infiniband FPGA Firmware Rev : 0x20B

- Completed ICUL1G FPGA Rev Test.

 

- Started ICUL1G AT23 Temperature Test...

- Completed ICUL1G AT23 Temperature Test.

 

- Started ICUL1G FPGA Temperature Test...

- Completed ICUL1G FPGA Temperature Test.

 

- Started PG Register Test

- Completed PG Register Test

- Started PG LVM BIST

- Completed PG LVM BIST

- Started PG SVM Test

- Completed PG SVM Test

- Started FPGA Register Test

- Completed FPGA Register Test

- Started Misc FPGA Register Test.

- Completed Misc FPGA Register Test.

- Started FPGA Level Set Memory Test

- Completed FPGA Level Set Memory Test

- Started SDRAM Data Test

- Completed SDRAM Data Test

 

- Started ICUL1G ADC BIT Test...

- Completed ICUL1G ADC BIT Test.

- Started ICUL1G AT23 Comparator Test...

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed ICUL1G AT23 Comparator Test.

- Started InfiniBand State Test

- Check IDPConfig and RPC Ethernet Communication

- == Running with Image Processing PC(IMGPC0) ==

- Testing HCA Status Test

- Testing TCA Status Test

- Testing IB Status Test

- Completed InfiniBand State Test

- Started ICUL1G Frequency Counter Test

- Testing DUT Chan 48

- Testing DUT Chan 49

- Testing DUT Chan 50

- Testing DUT Chan 51

- Testing DUT Chan 52

- Testing DUT Chan 53

- Testing DUT Chan 54

- Testing DUT Chan 55

- Completed ICUL1G Frequency Counter Test

- Started ICUL1G Sync Code Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed ICUL1G Sync Code Test

- Started ICUL1G Serial Capture Test

- Test in 100M/DDR/NormalCapture/Serial1/1 Lane

- Test in 100M/DDR/NormalCapture/Serial1/2 Lane

- Test in 100M/DDR/NormalCapture/Serial1/4 Lane

- Test in 100M/DDR/NormalCapture/Serial1/16 Lane

- Test in 100M/DDR/NormalCapture/Serial2/1 Lane

- Test in 100M/DDR/NormalCapture/Serial2/2 Lane

- Test in 100M/DDR/NormalCapture/Serial2/3 Lane

- Test in 100M/DDR/NormalCapture/Serial2/4 Lane

- Test in 100M/DDR/NormalCapture/Serial3/16 Lane

- Test in 100M/DDR/RawCapture/Serial2/1 Lane

- Test in 100M/DDR/RawCapture/Serial2/2 Lane

- Test in 100M/DDR/RawCapture/Serial2/3 Lane

- Test in 100M/DDR/RawCapture/Serial2/4 Lane

- Test in 100M/DDR/RawCapture/Serial3/16 Lane

- Test in 100M/DDR/NormalCapture/Serial1/10 Lane

- Test in 100M/DDR/NormalCapture/Serial3/10 Lane

- Test in 100M/DDR/RawCapture/Serial3/10 Lane

- Completed ICUL1G Serial Capture Test

- Started ICUL1G Differential Polarity Test

- Completed ICUL1G Differential Polarity Test

 

- Completed ICUL1G test on slot 16

 

- Run time: 0.7 min

 

%JOB_END - ****PASSED**** ICUL1G Quick Check of slot 16 (S/N:) at 12:40:09 PM

 

%JOB_START - Beginning ICUL1G Calibration test on slot 16 at 12:40:30 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 (P5) DIB:

P/N 51745600 S/N Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02 (P5), Build: 10.23.14.08.52

%INFO - Maintenance Not installed,

%INFO - -----------------------------------------------------------------------

- ** Pre-Check before Calibration on slot 16 **

- Started ICUL1G Board IDPROM Test...

- ICUL1G Mother Board - P/N:51746301 Rev:1114A S/N:

- ICUL1G Rider Board - P/N:51746400 Rev:1039A S/N:

- Completed ICUL1G Board IDPROM Test.

 

- Active Device Set: HighSpeed1.1.1

 

- Started ICUL1G Temperature Test...

- ICUL1G Board TempSensor0 Temperature: 30.5 degrees C

- ICUL1G Board TempSensor1 Temperature: 30.5 degrees C

- ICUL1G Board TempSensor2 Temperature: 28.0 degrees C

- ICUL1G Board TempSensor3 Temperature: 32.0 degrees C

- ICUL1G Board TempSensor4 Temperature: 23.0 degrees C

- Completed ICUL1G Temperature Test.

 

- Started ICUL1G POL Test...

- Completed ICUL1G POL Test.

 

- Started ICUL1G FPGA Rev. Test...

- Misc FPGA Rev : 0xE

- Misc FPGA Firmware Rev : 0x34

- Channel FPGA Rev : 0x22

- Infiniband FPGA Rev : 0xD

- Infiniband FPGA Firmware Rev : 0x20B

- Completed ICUL1G FPGA Rev Test.

 

- Started ICUL1G AT23 Temperature Test...

- Completed ICUL1G AT23 Temperature Test.

 

- Started ICUL1G FPGA Temperature Test...

- Completed ICUL1G FPGA Temperature Test.

 

- ** Ended Pre-Check before Calibration **

 

- Started ICUL1G Calibration on slot 16

- Started CALBUS Cal

- Completed CALBUS Cal

-

- Started COMPDAC Cal

- Completed COMPDAC Cal

-

- Started PPMU FV Cal

- Completed PPMU FV Cal

-

- Started PPMU MV Cal

- Completed PPMU MV Cal

-

- Started PPMU IIOS Cal

- Completed PPMU IIOS Cal

-

- Started PPMU MI Cal

- Completed PPMU MI Cal

-

- Started PPMU FI Cal

- Completed PPMU FI Cal

-

- Started PE DRIVER Cal

- Completed PE DRIVER Cal

-

- Started PE IMPEDANCE Cal

- Completed PE IMPEDANCE Cal

-

- Started PE SE COMP Cal

- Completed PE SE COMP Cal

-

- Started PE DIFF COMP Cal

- Completed PE DIFF COMP Cal

-

- Started PPMU CURRENT-CLAMP Cal

- Completed PPMU CURRENT-CLAMP Cal

-

- Started PPMU VOLTAGE-CLAMP Cal

- Completed PPMU VOLTAGE-CLAMP Cal

-

- Started ICUL1G Walking Strobe Start Timing Calculation on slot 16

- Completed ICUL1G Walking Strobe Start Timing Calculation on slot 16

 

- Started ICUL1G Phase Adjustment SyncBit for Source and Capture on slot 16

- Completed ICUL1G Phase Adjustment SyncBit for Source and Capture on slot 16

 

- Started ICUL1G Phase Adjustment Test between REFCLK and Drive Sync Capture Enable Bit on

slot 16

- Completed ICUL1G Phase Adjustment Test between REFCLK and Drive Sync Capture Enable Bit

on slot 16

 

- Started ICUL1G Walking Strobe Start Timing Calculation on slot 16

- Completed ICUL1G Walking Strobe Start Timing Calculation on slot 16

 

- Started ICUL1G External Delay Calibration on slot 16

- Completed ICUL1G External Delay Calibration on slot 16

 

- Started ICUL1G IDelay Calibration on slot 16

- Completed ICUL1G IDelay Calibration on slot 16

 

- Started ICUL1G Internal Path Calibration on slot 16

- Completed ICUL1G Internal Path Calibration on slot 16

 

- Started ICUL1G Slave Drive Calibration on slot 16

- Completed ICUL1G Slave Drive Calibration on slot 16

 

- Started ICUL1G Slave Receive Calibration on slot 16

- Completed ICUL1G Slave Receive Calibration on slot 16

 

- Started ICUL1G AC CALTREE TDT Calibration on slot 16

- Completed ICUL1G AC CALTREE TDT Calibration on slot 16

 

- Started ICUL1G Drive Calibration on slot 16

- Completed ICUL1G Drive Calibration on slot 16

 

- Started ICUL1G Data-Clock Capture Calibration on slot 16

- Completed ICUL1G Data-Clock Capture Calibration on slot 16

 

- Completed ICUL1G Calibration on slot 16

 

- Run time: 7.7 min

 

%JOB_END - ****PASSED**** ICUL1G Calibration of slot 16 (S/N:) at 12:48:12 PM

 

- Writing to System Calibration file - Begin (up to 5 minutes)

- Writing to System Calibration file - End

%JOB_START - Beginning ICUL1G Module Check test on slot 16 at 12:48:39 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 (P5) DIB:

P/N 51745600 S/N Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02 (P5), Build: 10.23.14.08.52

%INFO - Maintenance Not installed,

%INFO - -----------------------------------------------------------------------

- Started ICUL1G test on slot 16

- Started ICUL1G Board IDPROM Test...

- ICUL1G Mother Board - P/N:51746301 Rev:1114A S/N:

- ICUL1G Rider Board - P/N:51746400 Rev:1039A S/N:

- Completed ICUL1G Board IDPROM Test.

 

- Active Device Set: HighSpeed1.1.1

 

- Started ICUL1G Temperature Test...

- ICUL1G Board TempSensor0 Temperature: 30.5 degrees C

- ICUL1G Board TempSensor1 Temperature: 31.0 degrees C

- ICUL1G Board TempSensor2 Temperature: 28.5 degrees C

- ICUL1G Board TempSensor3 Temperature: 32.0 degrees C

- ICUL1G Board TempSensor4 Temperature: 23.5 degrees C

- Completed ICUL1G Temperature Test.

 

- Started ICUL1G POL Test...

- Completed ICUL1G POL Test.

 

- Started ICUL1G FPGA Rev. Test...

- Misc FPGA Rev : 0xE

- Misc FPGA Firmware Rev : 0x34

- Channel FPGA Rev : 0x22

- Infiniband FPGA Rev : 0xD

- Infiniband FPGA Firmware Rev : 0x20B

- Completed ICUL1G FPGA Rev Test.

 

- Started ICUL1G AT23 Temperature Test...

- Completed ICUL1G AT23 Temperature Test.

 

- Started ICUL1G FPGA Temperature Test...

- Completed ICUL1G FPGA Temperature Test.

 

- Started PG Register Test

- Completed PG Register Test

- Started PG LVM BIST

- takes about 1 min...

- Completed PG LVM BIST

- Started PG SVM Test

- Completed PG SVM Test

- Started FPGA Register Test

- Completed FPGA Register Test

- Started Misc FPGA Register Test.

- Completed Misc FPGA Register Test.

- Started FPGA Level Set Memory Test

- Completed FPGA Level Set Memory Test

- Started SDRAM Data Test

- takes about 10 sec...

- Completed SDRAM Data Test

 

- Started ICUL1G ADC BIT Test...

- Completed ICUL1G ADC BIT Test.

- Started ICUL1G AT23 Comparator Test...

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed ICUL1G AT23 Comparator Test.

 

- Started ICUL1G DUT Relay Test...

- Completed ICUL1G DUT Relay Test.

- Started PPMU FV Test

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed PPMU FV Test

- Started PPMU MV Test

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed PPMU MV Test

- Started PPMU FI Test

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed PPMU FI Test

- Started PPMU MI Test

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed PPMU MI Test

- Started PPMU V Clamp Test

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed PPMU V Clamp Test

- Started ICUL1G DGS Test...

- Completed ICUL1G DGS Test.

 

- Started InfiniBand State Test

- Check IDPConfig and RPC Ethernet Communication

- == Running with Image Processing PC(IMGPC0) ==

- Testing HCA Status Test

- Testing TCA Status Test

- Testing IB Status Test

- Completed InfiniBand State Test

- Started ICUL1G State Bus Test

- Check Capture_Enable/Disable U-code

- Testing NORMAL

- Testing EXTENDED

- Testing QUAD

- Check FrequencyCounter_Start U-code

- Testing NORMAL

- Testing EXTENDED

- Testing QUAD

- Completed ICUL1G State Bus Test

- Started XFER Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed XFER Test

- Started ICUL1G Frequency Counter Test

- Testing DUT Chan 48

- Testing DUT Chan 49

- Testing DUT Chan 50

- Testing DUT Chan 51

- Testing DUT Chan 52

- Testing DUT Chan 53

- Testing DUT Chan 54

- Testing DUT Chan 55

- Completed ICUL1G Frequency Counter Test

- Started ICUL1G Pixel/Line Size Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed ICUL1G Pixel/Line Size Test

- Started ICUL1G Frame Count Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed ICUL1G Frame Count Test

- Started ICUL1G Line HoldOff Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed ICUL1G Line HoldOff Test

- Started ICUL1G Frame HoldOff Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed ICUL1G Frame HoldOff Test

- Started ICUL1G Sync HoldOff Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed ICUL1G Sync HoldOff Test

- Started ICUL1G Sync Code Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed ICUL1G Sync Code Test

- Started ICUL1G Pixel Clipping Alarm Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed ICUL1G Pixel Clipping Alarm Test

- Started ICUL1G Line Clipping Alarm Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed ICUL1G Line Clipping Alarm Test

- Started ICUL1G Frequency Counter Alarm Test

- Testing DUT Chan 48

- Testing DUT Chan 49

- Testing DUT Chan 50

- Testing DUT Chan 51

- Testing DUT Chan 52

- Testing DUT Chan 53

- Testing DUT Chan 54

- Testing DUT Chan 55

- Completed ICUL1G Frequency Counter Alarm Test

- Started ICUL1G VSync Interval Alarm Test

- Testing Pin Group 0(Ch48/Ch56)

- Testing Pin Group 1(Ch49/Ch57)

- Testing Pin Group 2(Ch50/Ch58)

- Testing Pin Group 3(Ch51/Ch59)

- Testing Pin Group 4(Ch52/Ch60)

- Testing Pin Group 5(Ch53/Ch61)

- Testing Pin Group 6(Ch54/Ch62)

- Testing Pin Group 7(Ch55/Ch63)

- Completed ICUL1G VSync Interval Alarm Test

- Started ICUL1G Serial Capture Test

- Test in 100M/DDR/NormalCapture/Serial1/1 Lane

- Test in 300M/DDR/NormalCapture/Serial1/1 Lane

- Test in 100M/DDR/NormalCapture/Serial1/2 Lane

- Test in 300M/DDR/NormalCapture/Serial1/2 Lane

- Test in 100M/DDR/NormalCapture/Serial1/4 Lane

- Test in 300M/DDR/NormalCapture/Serial1/4 Lane

- Test in 100M/DDR/NormalCapture/Serial1/16 Lane

- Test in 300M/DDR/NormalCapture/Serial1/16 Lane

- Test in 100M/DDR/NormalCapture/Serial2/1 Lane

- Test in 300M/DDR/NormalCapture/Serial2/1 Lane

- Test in 100M/DDR/NormalCapture/Serial2/2 Lane

- Test in 300M/DDR/NormalCapture/Serial2/2 Lane

- Test in 100M/DDR/NormalCapture/Serial2/3 Lane

- Test in 300M/DDR/NormalCapture/Serial2/3 Lane

- Test in 100M/DDR/NormalCapture/Serial2/4 Lane

- Test in 300M/DDR/NormalCapture/Serial2/4 Lane

- Test in 100M/DDR/NormalCapture/Serial3/16 Lane

- Test in 300M/DDR/NormalCapture/Serial3/16 Lane

- Test in 100M/DDR/RawCapture/Serial2/1 Lane

- Test in 300M/DDR/RawCapture/Serial2/1 Lane

- Test in 100M/DDR/RawCapture/Serial2/2 Lane

- Test in 300M/DDR/RawCapture/Serial2/2 Lane

- Test in 100M/DDR/RawCapture/Serial2/3 Lane

- Test in 300M/DDR/RawCapture/Serial2/3 Lane

- Test in 100M/DDR/RawCapture/Serial2/4 Lane

- Test in 300M/DDR/RawCapture/Serial2/4 Lane

- Test in 100M/DDR/RawCapture/Serial3/16 Lane

- Test in 300M/DDR/RawCapture/Serial3/16 Lane

- Test in 100M/DDR/NormalCapture/Serial1/10 Lane

- Test in 300M/DDR/NormalCapture/Serial1/10 Lane

- Test in 100M/DDR/NormalCapture/Serial3/10 Lane

- Test in 300M/DDR/NormalCapture/Serial3/10 Lane

- Test in 100M/DDR/RawCapture/Serial3/10 Lane

- Test in 300M/DDR/RawCapture/Serial3/10 Lane

- Completed ICUL1G Serial Capture Test

- Started ICUL1G Differential Polarity Test

- Completed ICUL1G Differential Polarity Test

- Completed ICUL1G test on slot 16

 

- Run time: 8.5 min

 

%JOB_END - ****PASSED**** ICUL1G Module Check of slot 16 (S/N:) at 12:57:11 PM

 

%JOB_START - Beginning ICUL1G Performance Verification test on slot 16 at 12:57:34 PM

on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 (P5) DIB:

P/N 51745600 S/N Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02 (P5), Build: 10.23.14.08.52

%INFO - Maintenance Not installed,

%INFO - -----------------------------------------------------------------------

- Started ICUL1G test on slot 16

- Started ICUL1G Board IDPROM Test...

- ICUL1G Mother Board - P/N:51746301 Rev:1114A S/N:

- ICUL1G Rider Board - P/N:51746400 Rev:1039A S/N:

- Completed ICUL1G Board IDPROM Test.

 

- Active Device Set: HighSpeed1.1.1

 

- Started ICUL1G Temperature Test...

- ICUL1G Board TempSensor0 Temperature: 31.0 degrees C

- ICUL1G Board TempSensor1 Temperature: 31.0 degrees C

- ICUL1G Board TempSensor2 Temperature: 28.5 degrees C

- ICUL1G Board TempSensor3 Temperature: 32.0 degrees C

- ICUL1G Board TempSensor4 Temperature: 23.5 degrees C

- Completed ICUL1G Temperature Test.

 

- Started ICUL1G POL Test...

- Completed ICUL1G POL Test.

 

- Started ICUL1G FPGA Rev. Test...

- Misc FPGA Rev : 0xE

- Misc FPGA Firmware Rev : 0x34

- Channel FPGA Rev : 0x22

- Infiniband FPGA Rev : 0xD

- Infiniband FPGA Firmware Rev : 0x20B

- Completed ICUL1G FPGA Rev Test.

 

- Started ICUL1G AT23 Temperature Test...

- Completed ICUL1G AT23 Temperature Test.

 

- Started ICUL1G FPGA Temperature Test...

- Completed ICUL1G FPGA Temperature Test.

 

- Started PPMU FV Performance Test

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed PPMU FV Performance Test

- Started PPMU MV Performance Test

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed PPMU MV Performance Test

- Started PPMU FI Performance Test

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed PPMU FI Performance Test

- Started PPMU MI Performance Test

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed PPMU MI Performance Test

- Started PPMU V Clamp Performance Test

- Testing DUT Chan 48-51

- Testing DUT Chan 52-55

- Testing DUT Chan 56-59

- Testing DUT Chan 60-63

- Testing DUT Chan 64-67

- Testing DUT Chan 68-71

- Completed PPMU V Clamp Performance Test

- Started InfiniBand State Test

- Check IDPConfig and RPC Ethernet Communication

- == Running with Image Processing PC(IMGPC0) ==

- Testing HCA Status Test

- Testing TCA Status Test

- Testing IB Status Test

- Completed InfiniBand State Test

- Started ICUL1G Serial Capture Test

- Test in 100M/DDR/NormalCapture/Serial1/1 Lane

- Test in 300M/DDR/NormalCapture/Serial1/1 Lane

- Test in 100M/DDR/NormalCapture/Serial1/2 Lane

- Test in 300M/DDR/NormalCapture/Serial1/2 Lane

- Test in 100M/DDR/NormalCapture/Serial1/4 Lane

- Test in 300M/DDR/NormalCapture/Serial1/4 Lane

- Test in 100M/DDR/NormalCapture/Serial1/16 Lane

- Test in 300M/DDR/NormalCapture/Serial1/16 Lane

- Test in 100M/DDR/NormalCapture/Serial2/1 Lane

- Test in 300M/DDR/NormalCapture/Serial2/1 Lane

- Test in 100M/DDR/NormalCapture/Serial2/2 Lane

- Test in 300M/DDR/NormalCapture/Serial2/2 Lane

- Test in 100M/DDR/NormalCapture/Serial2/3 Lane

- Test in 300M/DDR/NormalCapture/Serial2/3 Lane

- Test in 100M/DDR/NormalCapture/Serial2/4 Lane

- Test in 300M/DDR/NormalCapture/Serial2/4 Lane

- Test in 100M/DDR/NormalCapture/Serial3/16 Lane

- Test in 300M/DDR/NormalCapture/Serial3/16 Lane

- Test in 100M/DDR/RawCapture/Serial2/1 Lane

- Test in 300M/DDR/RawCapture/Serial2/1 Lane

- Test in 100M/DDR/RawCapture/Serial2/2 Lane

- Test in 300M/DDR/RawCapture/Serial2/2 Lane

- Test in 100M/DDR/RawCapture/Serial2/3 Lane

- Test in 300M/DDR/RawCapture/Serial2/3 Lane

- Test in 100M/DDR/RawCapture/Serial2/4 Lane

- Test in 300M/DDR/RawCapture/Serial2/4 Lane

- Test in 100M/DDR/RawCapture/Serial3/16 Lane

- Test in 300M/DDR/RawCapture/Serial3/16 Lane

- Test in 100M/DDR/NormalCapture/Serial1/10 Lane

- Test in 300M/DDR/NormalCapture/Serial1/10 Lane

- Test in 100M/DDR/NormalCapture/Serial3/10 Lane

- Test in 300M/DDR/NormalCapture/Serial3/10 Lane

- Test in 100M/DDR/RawCapture/Serial3/10 Lane

- Test in 300M/DDR/RawCapture/Serial3/10 Lane

- Completed ICUL1G Serial Capture Test

- Completed ICUL1G test on slot 16

 

- Run time: 4.4 min

 

%JOB_END - ****PASSED**** ICUL1G Performance Verification of slot 16 (S/N:) at

1:01:55 PM

 

 

%JOB_START - Beginning systemwide tests at 11:27:39 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750 (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Systemwide functionality and continuity to slot 0

- Systemwide functionality and continuity to slot 1

- Starting BackPlane Fail Bus test

- Completed BackPlane Fail Bus test

- Completed Extra

 

%JOB_END - ****PASSED**** Systemwide tests at 11:27:41 AM

 

%JOB_START - Beginning CUB Module Check test on slot 18 at 11:27:52 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_(IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Testing CalCUB and CalDIB Leakage

- Completed Cal Dib Leakage Test

- Testing CalCUB Voltage Sources on CalDIB

- Beginning Cal DIB RawV Test on Slot18

- Completed Cal DIB RawV Test on Slot 18

- Beginning Cal Dib to BPMU Test on Slot 0

- Completed Cal Dib to BPMU Test on Slot 0

- Beginning Cal Dib to EXTERN Test on Slot 0

- Completed Cal Dib to EXTERN Test on Slot 0

- Testing CalDIB Utility Bit Relays using Channel Board Utility Bits for Slot 0

- Completed Cal Dib to UTIL Test on Slot 0

- Beginning Cal Dib RF Tree & Pogo Test

 

- Beginning Cal Dib to BPMU Test on Slot 1

- Completed Cal Dib to BPMU Test on Slot 1

- Beginning Cal Dib to EXTERN Test on Slot 1

- Completed Cal Dib to EXTERN Test on Slot 1

- Testing CalDIB Utility Bit Relays using Channel Board Utility Bits for Slot 1

- Completed Cal Dib to UTIL Test on Slot 1

- Beginning Cal Dib RF Tree & Pogo Test

 

- Beginning Cal DIB to DPS_FSG Test on Slot 22

- Completed Cal DIB to DPS_FSG Test on Slot 22

- Testing Device Ground Sense on CalDIB

- Completed DGS Test

- ****Completed CalDib Test****

- Start Compare Level Vol test

- Completed Compare Level Vol test

- Start Compare Level Voh test

- Completed Compare Level Voh test

- Start Drive_Level_test VIL

- Completed Drive_Level_test VIL

- Start Drive_Level_test VIH

- Completed Drive_Level_test VIH

- Beginning CalCub_Measure_Current using Bpmu in Slot 0

- Completed CalCub_Measure_Current

 

%JOB_END - ****PASSED**** CUB Module Check of slot 18 (S/N:XXXXXXX) at 11:28:20 AM

 

 

%JOB_START - Beginning CUB Calibration test on slot 18 at 11:29:14 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750 (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting Channel Drive Levels: Vih Vil

- Starting Channel Compare Levels: Voh Vol

- Finished Channel Calibration

 

%JOB_END - ****PASSED**** CUB Calibration of slot 18 (S/N:XXXXXXXX) at 11:29:14 AM

 

%JOB_START - Beginning Channel_Board_DIB Calibration test on slot(s) 0,1 at 11:29:27 AM on

1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750(IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting DC Calibration on slot 0

- Systemwide functionality and continuity to slot 0

- Starting dib_test

- Temperature at PE Ch00 is 38 deg C

- Temperature at PE Ch60 is 37 deg C

- Temperature at TG Ch60 is 26 deg C

- Temperature at TG Ch00 is 48 deg C

- Starting BPMU Force Voltage

- Starting Bpmu Clamp Voltage

- Starting Bpmu Measure Voltage

- Starting Bpmu Measure Current

- Starting Bpmu Force current

- Starting Bpmu Limit current

- Starting Channel Drive Levels: Vih Vil

- Starting Channel Drive Levels: VT50ohm

- Starting Channel Compare Levels: Voh Vol

- Starting Channel Clamps: Vch Vcl

- Starting Channel Loads: Ioh Iol

- Starting Channel Load Threshold: Vt

- Starting HV Channel Drive Levels

- Starting HV Channel Drive Current

- Starting FHV Channel Drive Levels

- Ppmu Mi Warmup 11:31:34 AM

- Ppmu Mi Warmup 11:31:34 AM

- Starting Ppmu Force Voltage

- Starting Ppmu Measure Voltage

- Starting Ppmu Force Current Ppmu Force 200ua

- Starting Ppmu Force Current Ppmu Force 2ma

- Starting Ppmu Force Current Ppmu Force 50ma

- Starting Ppmu Force Current Ppmu Force 20ua

- Starting Ppmu Measure 2ma

- Continuing Ppmu Measure Current chan 15

- Continuing Ppmu Measure Current chan 31

- Continuing Ppmu Measure Current chan 47

- Continuing Ppmu Measure Current chan 63

- Starting Ppmu Measure 200ua

- Continuing Ppmu Measure Current chan 15

- Continuing Ppmu Measure Current chan 31

- Continuing Ppmu Measure Current chan 47

- Continuing Ppmu Measure Current chan 63

- Starting Ppmu Measure 20ua

- Continuing Ppmu Measure Current chan 15

- Continuing Ppmu Measure Current chan 31

- Continuing Ppmu Measure Current chan 47

- Continuing Ppmu Measure Current chan 63

- Starting Ppmu Measure 2ua

- Continuing Ppmu Measure Current chan 15

- Continuing Ppmu Measure Current chan 31

- Continuing Ppmu Measure Current chan 47

- Continuing Ppmu Measure Current chan 63

- Starting Ppmu Measure 50ma

- Continuing Ppmu Measure Current chan 15

- Continuing Ppmu Measure Current chan 31

- Continuing Ppmu Measure Current chan 47

- Continuing Ppmu Measure Current chan 63

- Finished Channel Calibration

- Finished DC Calibration on slot 0

- Starting DC Calibration on slot 1

- Systemwide functionality and continuity to slot 1

- Starting dib_test

- Temperature at PE Ch00 is 36 deg C

- Temperature at PE Ch60 is 36 deg C

- Temperature at TG Ch60 is 25 deg C

- Temperature at TG Ch00 is 45 deg C

- Starting BPMU Force Voltage

- Starting Bpmu Clamp Voltage

- Starting Bpmu Measure Voltage

- Starting Bpmu Measure Current

- Starting Bpmu Force current

- Starting Bpmu Limit current

- Starting Channel Drive Levels: Vih Vil

- Starting Channel Drive Levels: VT50ohm

- Starting Channel Compare Levels: Voh Vol

- Starting Channel Clamps: Vch Vcl

- Starting Channel Loads: Ioh Iol

- Starting Channel Load Threshold: Vt

- Starting HV Channel Drive Levels

- Starting HV Channel Drive Current

- Starting FHV Channel Drive Levels

- Ppmu Mi Warmup 11:37:11 AM

- Ppmu Mi Warmup 11:37:11 AM

- Starting Ppmu Force Voltage

- Starting Ppmu Measure Voltage

- Starting Ppmu Force Current Ppmu Force 200ua

- Starting Ppmu Force Current Ppmu Force 2ma

- Starting Ppmu Force Current Ppmu Force 50ma

- Starting Ppmu Force Current Ppmu Force 20ua

- Starting Ppmu Measure 2ma

- Continuing Ppmu Measure Current chan 79

- Continuing Ppmu Measure Current chan 95

- Continuing Ppmu Measure Current chan 111

- Continuing Ppmu Measure Current chan 127

- Starting Ppmu Measure 200ua

- Continuing Ppmu Measure Current chan 79

- Continuing Ppmu Measure Current chan 95

- Continuing Ppmu Measure Current chan 111

- Continuing Ppmu Measure Current chan 127

- Starting Ppmu Measure 20ua

- Continuing Ppmu Measure Current chan 79

- Continuing Ppmu Measure Current chan 95

- Continuing Ppmu Measure Current chan 111

- Continuing Ppmu Measure Current chan 127

- Starting Ppmu Measure 2ua

- Continuing Ppmu Measure Current chan 79

- Continuing Ppmu Measure Current chan 95

- Continuing Ppmu Measure Current chan 111

- Continuing Ppmu Measure Current chan 127

- Starting Ppmu Measure 50ma

- Continuing Ppmu Measure Current chan 79

- Continuing Ppmu Measure Current chan 95

- Continuing Ppmu Measure Current chan 111

- Continuing Ppmu Measure Current chan 127

- Finished Channel Calibration

- Finished DC Calibration on slot 1

 

%JOB_END - ****PASSED**** Channel_Board_DIB Calibration of slot(s) 0, 1 at 11:40:41 AM

- PASS slot 0 (S/N XXXXXXX)

- PASS slot 1 (S/N XXXXXXX)

 

%JOB_START - Beginning DPS_DIB Calibration test on slot 22 at 11:40:54 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting DPS Calibration on slot 22

 

- Calibrating DPS Voltage on slot 22

- Calibrating DPS Current Limit on slot 22

- Calibrating DPS Current Measure (50uA Range) on slot 22

- Calibrating DPS Current Measure (500uA Range) on slot 22

- Calibrating DPS Current Measure (10mA Range) on slot 22

- Calibrating DPS Current Measure (100mA Range) on slot 22

- Calibrating DPS Current Measure (1A Range) on slot 22

 

- Finished DPS Calibration on slot 22

 

 

%JOB_END - ****PASSED**** DPS_DIB Calibration of slot 22 (S/N:XXXXXXXX) at 11:41:17 AM

 

%JOB_START - Beginning APMU Calibration test on slot 5 at 11:41:30 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting APMU IDPROM test

- APMU Mother Board - P/N:51740001 Rev:1012A S/N: xxxxxxxx

- APMU Relay Board - P/N:51740200 Rev:2060 S/N:

- APMU Rider Board - P/N:51740100 Rev:5200 S/N:

- APMU Rider Board - P/N:51740100 Rev:5200 S/N:

- APMU Rider Board - P/N:51740100 Rev:5200 S/N:

- APMU Rider Board - P/N:51740100 Rev:5200 S/N:

- APMU Rider Board - P/N:51740100 Rev:5200 S/N:

- APMU Rider Board - P/N:51740100 Rev:5200 S/N:

- APMU Rider Board - P/N:51740100 Rev:5200 S/N:

- APMU Rider Board - P/N:51740100 Rev:5200 S/N:

- Completed APMU IDPROM test

-

- Starting APMU Calibration on slot 5

 

 

- Completed APMU Calibration on slot 5

 

 

%JOB_END - ****PASSED**** APMU Calibration of slot 5 (S/N:xxxxxxxx) at 11:43:48 AM

 

%JOB_START - Beginning ICUA Calibration test on slot 2 at 11:44:01 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting dib_test

- ICUA-2 P/N:51742601 Rev:738B S/N:

- %INFO -- ADM on ICUA-2 Chan0 Slot2, ADM P/N:51740520 Rev:735C S/N:

- %INFO -- ADM on ICUA-2 Chan1 Slot2, ADM P/N:51740520 Rev:735C S/N:

- %INFO -- ADM on ICUA-2 Chan2 Slot2, ADM P/N:51740520 Rev:735C S/N:

- %INFO -- ADM on ICUA-2 Chan3 Slot2, ADM P/N:51740520 Rev:735C S/N:

- ICUA-2 Relay board P/N:51742800 Rev:515C S/N:

- [ICUA Reference DAC Calibration]

- [ADM Range Calibration]

- - CDS Cal for AD9101

- - ICUA Chan 8 - (up to 1 min)

- - ICUA Chan 9 - (up to 1 min)

- - ICUA Chan 10 - (up to 1 min)

- - ICUA Chan 11 - (up to 1 min)

- [ADM DAC's Calibration]

- - ICUA Chan 8 -

- - ICUA Chan 9 -

- - ICUA Chan 10 -

- - ICUA Chan 11 -

- [Line Clamp Calibration]

- - ICUA Chan 8 -

- - ICUA Chan 8 -

- - ICUA Chan 9 -

- - ICUA Chan 9 -

- - ICUA Chan 10 -

- - ICUA Chan 10 -

- - ICUA Chan 11 -

- - ICUA Chan 11 -

- Complete ICUA Calibration 154.9 sec

 

%JOB_END - ****PASSED**** ICUA Calibration of slot 2 (S/N:) at 11:46:36 AM

 

%JOB_START - Beginning AC Calibration at 11:46:48 AM on 1/17/2020 in High Accuracy Mode

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Beginning Digital Channel Timing Calibration

- Building List of Digital Channels

- Checking CalDIB AC Continuity for all Digital Channels

- Calibrating Super Linear Interpolator (SLI)

- Measuring Cub Round Trip Delay

- Measuring RF Matrix Delay

- Calibrating Drive Edges

- Calibrating Receive Edges

- Calibrating Receive Window

- Calibrating HFMux

- Calibrating Mux Drive

- Calibrating Receive Mux

- Completed Digital Channel Timing Calibration

 

 

%JOB_END - ****PASSED**** AC Calibration at 11:49:40 AM

 

- Writing to System Calibration file - Begin (up to 5 minutes)

- Writing to System Calibration file - End

%JOB_START - Beginning systemwide tests at 11:51:24 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Systemwide functionality and continuity to slot 0

- Systemwide functionality and continuity to slot 1

- Starting BackPlane Fail Bus test

- Completed BackPlane Fail Bus test

- Completed Extra

 

%JOB_END - ****PASSED**** Systemwide tests at 11:51:25 AM

 

%JOB_START - Beginning CUB Module Check test on slot 18 at 11:51:36 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Testing CalCUB and CalDIB Leakage

- Completed Cal Dib Leakage Test

- Testing CalCUB Voltage Sources on CalDIB

- Beginning Cal DIB RawV Test on Slot18

- Completed Cal DIB RawV Test on Slot 18

- Beginning Cal Dib to BPMU Test on Slot 0

- Completed Cal Dib to BPMU Test on Slot 0

- Beginning Cal Dib to EXTERN Test on Slot 0

- Completed Cal Dib to EXTERN Test on Slot 0

- Testing CalDIB Utility Bit Relays using Channel Board Utility Bits for Slot 0

- Completed Cal Dib to UTIL Test on Slot 0

- Beginning Cal Dib RF Tree & Pogo Test

 

- Beginning Cal Dib to BPMU Test on Slot 1

- Completed Cal Dib to BPMU Test on Slot 1

- Beginning Cal Dib to EXTERN Test on Slot 1

- Completed Cal Dib to EXTERN Test on Slot 1

- Testing CalDIB Utility Bit Relays using Channel Board Utility Bits for Slot 1

- Completed Cal Dib to UTIL Test on Slot 1

- Beginning Cal Dib RF Tree & Pogo Test

 

- Beginning Cal DIB to DPS_FSG Test on Slot 22

- Completed Cal DIB to DPS_FSG Test on Slot 22

- Testing Device Ground Sense on CalDIB

- Completed DGS Test

- ****Completed CalDib Test****

- Start Compare Level Vol test

- Completed Compare Level Vol test

- Start Compare Level Voh test

- Completed Compare Level Voh test

- Start Drive_Level_test VIL

- Completed Drive_Level_test VIL

- Start Drive_Level_test VIH

- Completed Drive_Level_test VIH

- Beginning CalCub_Measure_Current using Bpmu in Slot 0

- Completed CalCub_Measure_Current

 

%JOB_END - ****PASSED**** CUB Module Check of slot 18 (S/N:xxxxxxxx) at 11:52:05 AM

 

%JOB_START - Beginning Channel_Board_DIB Module Check test on slot(s) 0,1 at 11:52:17 AM on

1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Beginning ID PROM Check

- Channel Board in Slot 0: Serial #:C1 Rev Date:1142B

- TERM. Rider in Slot 0: Serial #:C1 Rev Date:838A

- Channel Board in Slot 1: Serial #:C1 Rev Date:1113B

- TERM. Rider in Slot 1: Serial #:C1 Rev Date:838A

- Finished ID-PROM Check on all slots

- Beginning CB200 DUT Continuity

- ...Testing Board in Slot 0

- ...Testing Board in Slot 1

- Finished CB200 DUT Continuity on all slots

- Beginning Ram Test

- Finished on all slots

- Beginning ChanRam Test

- Finished on all slots

- Beginning Period Generator test

- Starting Residue test

- Finished Residue test

- Starting Period Ram Single Mode Test

- Finished Period Ram Single Mode Test

- Starting Period Ram Dual Mode Test

- Finished Period Ram Dual Mode Test

- Starting Period Ram Quad Mode Test

- Finished Period Ram Quad Mode Test

- Starting Residue test

- Finished Residue test

- Starting Period Ram Single Mode Test

- Finished Period Ram Single Mode Test

- Starting Period Ram Dual Mode Test

- Finished Period Ram Dual Mode Test

- Starting Period Ram Quad Mode Test

- Finished Period Ram Quad Mode Test

- Finished on all slots

- Beginning HFMUX test

- HFMux 4 test passed for channel output 0

- HFMux 4 test passed for channel output 2

- HFMux 4 test passed for channel output 12

- HFMux 4 test passed for channel output 14

- HFMux 4 test passed for channel output 16

- HFMux 4 test passed for channel output 18

- HFMux 4 test passed for channel output 28

- HFMux 4 test passed for channel output 30

- HFMux 4 test passed for channel output 32

- HFMux 4 test passed for channel output 34

- HFMux 4 test passed for channel output 44

- HFMux 4 test passed for channel output 46

- HFMux 4 test passed for channel output 48

- HFMux 4 test passed for channel output 50

- HFMux 4 test passed for channel output 0

- HFMux 4 test passed for channel output 2

- HFMux 4 test passed for channel output 12

- HFMux 4 test passed for channel output 14

- HFMux 4 test passed for channel output 16

- HFMux 4 test passed for channel output 18

- HFMux 4 test passed for channel output 28

- HFMux 4 test passed for channel output 30

- HFMux 4 test passed for channel output 32

- HFMux 4 test passed for channel output 34

- HFMux 4 test passed for channel output 44

- HFMux 4 test passed for channel output 46

- HFMux 4 test passed for channel output 48

- HFMux 4 test passed for channel output 50

- Finished HFMUX test on all slots

 

- Beginning KeepAlive Test

- Testing Single Mode

- Continuing test: Verifies PG Enters KA

- Extended Mode KeepAlive Pattern Test Start

- Continuing test: Verifies PG Exit.

- Continuing test: Vector Number Set

- Completed KeepAlive test

- Testing Dual Mode

- Continuing test: Verifies PG Enters KA

- Normal Mode KeepAlive Pattern Test Start

- Continuing test: Verifies PG Exit.

- Continuing test: Vector Number Set

- Completed KeepAlive test

- Testing Quad Mode

- Continuing test: Verifies PG Enters KA

- Quad Mode KeepAlive Pattern Test Start

- Continuing test: Verifies PG Exit.

- Continuing test: Vector Number Set

- Completed KeepAlive test

- Testing Single Mode

- Continuing test: Verifies PG Enters KA

- Extended Mode KeepAlive Pattern Test Start

- Continuing test: Verifies PG Exit.

- Continuing test: Vector Number Set

- Completed KeepAlive test

- Testing Dual Mode

- Continuing test: Verifies PG Enters KA

- Normal Mode KeepAlive Pattern Test Start

- Continuing test: Verifies PG Exit.

- Continuing test: Vector Number Set

- Completed KeepAlive test

- Testing Quad Mode

- Continuing test: Verifies PG Enters KA

- Quad Mode KeepAlive Pattern Test Start

- Continuing test: Verifies PG Exit.

- Continuing test: Vector Number Set

- Completed KeepAlive test

- Finished KeepAlive on all slots

 

- Beginning PE Vt Third Level test

- Beginning Third Level test for VT = 0 Volts

- Beginning Third Level test for VT = 1 Volts

- Beginning Third Level test for VT = 2 Volts

- Beginning Third Level test for VT = 3 Volts

- Beginning Third Level test for VT = 4 Volts

- Beginning Third Level test for VT = 5 Volts

- Finished on all slots

 

- Starting High Voltage Channel Tests

- Testing Legacy HV Driver on slot 0

- Testing Fast HV PE Driver on slot 0

- Testing Legacy HV Driver on slot 1

- Testing Fast HV PE Driver on slot 1

- Finished High Voltage Channel Tests on all slots

- Beginning Split RAM Test test

- Started RsvmRlvm1_Normal Test

- Continuing RsvmRlvm1_Normal test.

- Completed RsvmRlvm1_Normal test.

- Started RsvmRlvm2_Normal Test

- Continuing RsvmRlvm2_Normal test.

- Completed RsvmRlvm2_Normal test.

- Started RsvmRlvm3_Normal Test

- Continuing RsvmRlvm3_Normal test.

- Continuing RsvmRlvm3_Normal test.

- Completed RsvmRlvm3_Normal test.

- Started RsvmRlvm4_Normal Test

- Continuing RsvmRlvm4_Normal test.

- Continuing RsvmRlvm4_Normal test.

- Continuing RsvmRlvm4_Normal test.

- Continuing RsvmRlvm4_Normal test.

- Completed RsvmRlvm4_Normal test.

- Started RsvmRlvm_Combo1_Normal Test

- Completed RsvmRlvm_Combo1_Normal test.

- Started LvmAddr1_Normal Test

- Completed LvmAddr1_Normal test.

- Started LvmErr1_Normal Test

- Completed LvmErr1_Normal test.

- Started LvmCallSvmSubr1_Normal Test

- Continuing LvmCallSvmSubr1_Normal test.

- Continuing LvmCallSvmSubr1_Normal test.

- Completed LvmCallSvmSubr1_Normal test.

- Started RsvmRlvm1_Extended Test

- Continuing RsvmRlvm1_Extended test.

- Completed RsvmRlvm1_Extended test.

- Started RsvmRlvm2_Extended Test

- Continuing RsvmRlvm2_Extended test.

- Completed RsvmRlvm2_Extended test.

- Started RsvmRlvm3_Extended Test

- Continuing RsvmRlvm3_Extended test.

- Continuing RsvmRlvm3_Extended test.

- Completed RsvmRlvm3_Extended test.

- Started RsvmRlvm4_Extended Test

- Continuing RsvmRlvm4_Extended test.

- Continuing RsvmRlvm4_Extended test.

- Continuing RsvmRlvm4_Extended test.

- Completed RsvmRlvm4_Extended test.

- Started RsvmRlvm_Combo1_Extended Test

- Completed RsvmRlvm_Combo1_Extended test.

- Started LvmAddr1_Extended Test

- Completed LvmAddr1_Extended test.

- Started LvmErr1_Ext Test

- Completed LvmErr1_Ext test.

- Started LvmCallSvmSubr1_Extended Test

- Continuing LvmCallSvmSubr1_Extended test.

- Continuing LvmCallSvmSubr1_Extended test.

- Continuing LvmCallSvmSubr1_Extended test.

- Continuing LvmCallSvmSubr1_Extended test.

- Continuing LvmCallSvmSubr1_Extended test.

- Completed LvmCallSvmSubr1_Extended test.

- Started RsvmRlvm1_Normal Test

- Continuing RsvmRlvm1_Normal test.

- Completed RsvmRlvm1_Normal test.

- Started RsvmRlvm2_Normal Test

- Continuing RsvmRlvm2_Normal test.

- Completed RsvmRlvm2_Normal test.

- Started RsvmRlvm3_Normal Test

- Continuing RsvmRlvm3_Normal test.

- Continuing RsvmRlvm3_Normal test.

- Completed RsvmRlvm3_Normal test.

- Started RsvmRlvm4_Normal Test

- Continuing RsvmRlvm4_Normal test.

- Continuing RsvmRlvm4_Normal test.

- Continuing RsvmRlvm4_Normal test.

- Continuing RsvmRlvm4_Normal test.

- Completed RsvmRlvm4_Normal test.

- Started RsvmRlvm_Combo1_Normal Test

- Completed RsvmRlvm_Combo1_Normal test.

- Started LvmAddr1_Normal Test

- Completed LvmAddr1_Normal test.

- Started LvmErr1_Normal Test

- Completed LvmErr1_Normal test.

- Started LvmCallSvmSubr1_Normal Test

- Continuing LvmCallSvmSubr1_Normal test.

- Continuing LvmCallSvmSubr1_Normal test.

- Completed LvmCallSvmSubr1_Normal test.

- Started RsvmRlvm1_Extended Test

- Continuing RsvmRlvm1_Extended test.

- Completed RsvmRlvm1_Extended test.

- Started RsvmRlvm2_Extended Test

- Continuing RsvmRlvm2_Extended test.

- Completed RsvmRlvm2_Extended test.

- Started RsvmRlvm3_Extended Test

- Continuing RsvmRlvm3_Extended test.

- Continuing RsvmRlvm3_Extended test.

- Completed RsvmRlvm3_Extended test.

- Started RsvmRlvm4_Extended Test

- Continuing RsvmRlvm4_Extended test.

- Continuing RsvmRlvm4_Extended test.

- Continuing RsvmRlvm4_Extended test.

- Completed RsvmRlvm4_Extended test.

- Started RsvmRlvm_Combo1_Extended Test

- Completed RsvmRlvm_Combo1_Extended test.

- Started LvmAddr1_Extended Test

- Completed LvmAddr1_Extended test.

- Started LvmErr1_Ext Test

- Completed LvmErr1_Ext test.

- Started LvmCallSvmSubr1_Extended Test

- Continuing LvmCallSvmSubr1_Extended test.

- Continuing LvmCallSvmSubr1_Extended test.

- Continuing LvmCallSvmSubr1_Extended test.

- Continuing LvmCallSvmSubr1_Extended test.

- Continuing LvmCallSvmSubr1_Extended test.

- Completed LvmCallSvmSubr1_Extended test.

- Finished on all slots

- Beginning MuxPin Test

- MuxPin Test MuxTime = 0.1

- MuxPin Test MuxTime = 0.3

- MuxPin Test MuxTime = 0.5

- MuxPin Test MuxTime = 0.7

- MuxPin Test MuxTime = 0.9

- MuxPin Test MuxTime = 0.1

- MuxPin Test MuxTime = 0.3

- MuxPin Test MuxTime = 0.5

- MuxPin Test MuxTime = 0.7

- MuxPin Test MuxTime = 0.9

- Finished MuxPin Tests on all slots

 

- Starting DownLoad tests for slot 0

- Starting PG SVM Download test

- PG Download test passed.

- Completed PG SVM Download test

- Completed DownLoad tests for slot 0

- Starting DownLoad tests for slot 1

- Starting PG SVM Download test

- PG Download test passed.

- Completed PG SVM Download test

- Completed DownLoad tests for slot 1

- Finished on all slots

- Beginning Scan Test test

- Starting Scan Test Stride of: 3

- Scan Test Stride Register on Chan 0 Reads: 3 PASSED

- Scan Test TG LVM Image - Stride of 3 Passed

- Scan Test Stride Register on Chan 16 Reads: 3 PASSED

- Scan Test TG LVM Image - Stride of 3 Passed

- Scan Test Stride Register on Chan 32 Reads: 3 PASSED

- Scan Test TG LVM Image - Stride of 3 Passed

- Scan Test Stride Register on Chan 48 Reads: 3 PASSED

- Scan Test TG LVM Image - Stride of 3 Passed

- Starting Scan Test Stride of: 4

- Scan Test Stride Register on Chan 0 Reads: 4 PASSED

- Scan Test TG LVM Image - Stride of 4 Passed

- Scan Test Stride Register on Chan 16 Reads: 4 PASSED

- Scan Test TG LVM Image - Stride of 4 Passed

- Scan Test Stride Register on Chan 32 Reads: 4 PASSED

- Scan Test TG LVM Image - Stride of 4 Passed

- Scan Test Stride Register on Chan 48 Reads: 4 PASSED

- Scan Test TG LVM Image - Stride of 4 Passed

- Starting Scan Test Stride of: 9

- Scan Test Stride Register on Chan 0 Reads: 10 PASSED

- Scan Test TG LVM Image - Stride of 9 Passed

- Scan Test Stride Register on Chan 16 Reads: 10 PASSED

- Scan Test TG LVM Image - Stride of 9 Passed

- Scan Test Stride Register on Chan 32 Reads: 10 PASSED

- Scan Test TG LVM Image - Stride of 9 Passed

- Scan Test Stride Register on Chan 48 Reads: 10 PASSED

- Scan Test TG LVM Image - Stride of 9 Passed

- Starting Scan Test Stride of: 12

- Scan Test Stride Register on Chan 0 Reads: 12 PASSED

- Scan Test TG LVM Image - Stride of 12 Passed

- Scan Test Stride Register on Chan 16 Reads: 12 PASSED

- Scan Test TG LVM Image - Stride of 12 Passed

- Scan Test Stride Register on Chan 32 Reads: 12 PASSED

- Scan Test TG LVM Image - Stride of 12 Passed

- Scan Test Stride Register on Chan 48 Reads: 12 PASSED

- Scan Test TG LVM Image - Stride of 12 Passed

- Starting Scan Pattern Burst Over ADB on slot 0

- Scan Test Scan Burst Lower ADB Bits Passed

- Scan Test Scan Burst Upper ADB Bits Passed

- Starting Scan Test Stride of: 3

- Scan Test Stride Register on Chan 0 Reads: 3 PASSED

- Scan Test TG LVM Image - Stride of 3 Passed

- Scan Test Stride Register on Chan 16 Reads: 3 PASSED

- Scan Test TG LVM Image - Stride of 3 Passed

- Scan Test Stride Register on Chan 32 Reads: 3 PASSED

- Scan Test TG LVM Image - Stride of 3 Passed

- Scan Test Stride Register on Chan 48 Reads: 3 PASSED

- Scan Test TG LVM Image - Stride of 3 Passed

- Starting Scan Test Stride of: 4

- Scan Test Stride Register on Chan 0 Reads: 4 PASSED

- Scan Test TG LVM Image - Stride of 4 Passed

- Scan Test Stride Register on Chan 16 Reads: 4 PASSED

- Scan Test TG LVM Image - Stride of 4 Passed

- Scan Test Stride Register on Chan 32 Reads: 4 PASSED

- Scan Test TG LVM Image - Stride of 4 Passed

- Scan Test Stride Register on Chan 48 Reads: 4 PASSED

- Scan Test TG LVM Image - Stride of 4 Passed

- Starting Scan Test Stride of: 9

- Scan Test Stride Register on Chan 0 Reads: 10 PASSED

- Scan Test TG LVM Image - Stride of 9 Passed

- Scan Test Stride Register on Chan 16 Reads: 10 PASSED

- Scan Test TG LVM Image - Stride of 9 Passed

- Scan Test Stride Register on Chan 32 Reads: 10 PASSED

- Scan Test TG LVM Image - Stride of 9 Passed

- Scan Test Stride Register on Chan 48 Reads: 10 PASSED

- Scan Test TG LVM Image - Stride of 9 Passed

- Starting Scan Test Stride of: 12

- Scan Test Stride Register on Chan 0 Reads: 12 PASSED

- Scan Test TG LVM Image - Stride of 12 Passed

- Scan Test Stride Register on Chan 16 Reads: 12 PASSED

- Scan Test TG LVM Image - Stride of 12 Passed

- Scan Test Stride Register on Chan 32 Reads: 12 PASSED

- Scan Test TG LVM Image - Stride of 12 Passed

- Scan Test Stride Register on Chan 48 Reads: 12 PASSED

- Scan Test TG LVM Image - Stride of 12 Passed

- Starting Scan Pattern Burst Over ADB on slot 1

- Scan Test Scan Burst Lower ADB Bits Passed

- Scan Test Scan Burst Upper ADB Bits Passed

- Finished on all slots

- Beginning SCIO Test

- Drive Burst SCIO Ones

- Drive Burst SCIO Zeros

- Receive Burst SCIO Ones

- Receive Burst SCIO Zeros

- Drive Burst SCIO Ones

- Drive Burst SCIO Zeros

- Receive Burst SCIO Ones

- Receive Burst SCIO Zeros

- Finished SCIO Test on all slots

- Starting DownLoad tests for slot 0

- Starting Extended Mode Download test

- Starting Edge Set RAM Download test

- Completed Edge Set RAM Download test

- Starting Format Map RAM Download test

- Completed Format Map RAM Download test

- Starting Format Set RAM Download test

- Completed Format Set RAM Download test

- Starting Tset Lookdown RAM Download test

- Completed Tset Lookdown RAM Download test

- Starting Misc Registers Download test

- Completed Misc Registers Download test

- Starting TG SVM Download test

- Completed TG SVM Download test

- Starting Quad Mode Download test

- Starting Edge Set RAM Download test

- Completed Edge Set RAM Download test

- Starting Format Map RAM Download test

- Completed Format Map RAM Download test

- Starting Format Set RAM Download test

- Completed Format Set RAM Download test

- Starting Tset Lookdown RAM Download test

- Completed Tset Lookdown RAM Download test

- Starting Misc Registers Download test

- Completed Misc Registers Download test

- Starting TG SVM Download test

- Completed TG SVM Download test

- Completed DownLoad tests for slot 0

- Starting DownLoad tests for slot 1

- Starting Extended Mode Download test

- Starting Edge Set RAM Download test

- Completed Edge Set RAM Download test

- Starting Format Map RAM Download test

- Completed Format Map RAM Download test

- Starting Format Set RAM Download test

- Completed Format Set RAM Download test

- Starting Tset Lookdown RAM Download test

- Completed Tset Lookdown RAM Download test

- Starting Misc Registers Download test

- Completed Misc Registers Download test

- Starting TG SVM Download test

- Completed TG SVM Download test

- Starting Quad Mode Download test

- Starting Edge Set RAM Download test

- Completed Edge Set RAM Download test

- Starting Format Map RAM Download test

- Completed Format Map RAM Download test

- Starting Format Set RAM Download test

- Completed Format Set RAM Download test

- Starting Tset Lookdown RAM Download test

- Completed Tset Lookdown RAM Download test

- Starting Misc Registers Download test

- Completed Misc Registers Download test

- Starting TG SVM Download test

- Completed TG SVM Download test

- Completed DownLoad tests for slot 1

- Finished on all slots

- Beginning PPMU FIMV

- PPMU FIMV IRange=50mA:Iforce=-25mA

- PPMU FIMV IRange=50mA:Iforce=0mA

- PPMU FIMV IRange=50mA:Iforce=25mA

- PPMU FIMV IRange=50mA:Iforce=40mA

- PPMU FIMV IRange=50mA:Iforce=50mA

- PPMU FIMV IRange=2mA:Iforce=-1.45mA

- PPMU FIMV IRange=2mA:Iforce=-1mA

- PPMU FIMV IRange=2mA:Iforce=0mA

- PPMU FIMV IRange=2mA:Iforce=1mA

- PPMU FIMV IRange=2mA:Iforce=2mA

- PPMU FIMV IRange=200uA:Iforce=-200uA

- PPMU FIMV IRange=200uA:Iforce=-100uA

- PPMU FIMV IRange=200uA:Iforce=0uA

- PPMU FIMV IRange=200uA:Iforce=100uA

- PPMU FIMV IRange=200uA:Iforce=200uA

- Finished PPMU FIMV

- Beginning PPMU FVMI

- PPMU FVMI Vforce=-1.5V Irange=2mA

- PPMU FVMI Vforce=-1V Irange=2mA

- PPMU FVMI Vforce=0V Irange=0.2mA

- PPMU FVMI Vforce=1V Irange=2mA

- PPMU FVMI Vforce=1.5V Irange=2mA

- PPMU FVMI Vforce=2V Irange=2mA

- PPMU FVMI Vforce=3V Irange=50mA

- PPMU FVMI Vforce=4V Irange=50mA

- PPMU FVMI Vforce=5V Irange=50mA

- PPMU FVMI Vforce=6V Irange=50mA

- Finished PPMU FVMI

- Starting MultiClock test

- Completed MultiClock test

 

- Beginning Frequency Counter test

- Completed Frequency Count test

 

- Beginning Levels Memory BIST

- Actual BIST Time for All boards = 0.171875secs

- Levels Memory BIST Passed on Slot: 1

- Levels Memory BIST Passed on Slot: 0

- Finished Levels Memory BIST on all slots

- Beginning Utility Bit test

- Completed Utility Bit test

- Beginning Utility Bit test

- Completed Utility Bit test

- Finished on all slots

- Starting Fail Bus test

- ...Testing Fail Bus on slot 0

- ...Testing Fail Bus on slot 1

- Finished on all slots

- Beginning Random Pattern test

- Starting Single Mode SVM Test

- Random Pattern Passed

 

- Random Pattern Passed

 

- Single Mode SVM Test Done

- Starting Single Mode LVM Test

- Random Pattern Passed

 

- Random Pattern Passed

 

- Single Mode LVM Test Done

- Starting Dual Mode SVM Test

- Random Pattern Passed

 

- Random Pattern Passed

 

- Dual Mode SVM Test Done

- Starting Dual Mode LVM Test

- Random Pattern Passed

 

- Random Pattern Passed

 

- Dual Mode LVM Test Done

- Starting Quad Mode SVM Test

- Random Pattern Passed

 

- Random Pattern Passed

 

- Quad Mode SVM Test Done

- Starting Quad Mode LVM Test

- Random Pattern Passed

 

- Random Pattern Passed

 

- Quad Mode LVM Test Done

- Finished on all slots

- Starting Board PMU test

- Completed Board PMU test

- Starting Board PMU test

- Completed Board PMU test

- Completed Channel_Board_DIB test on slot 1

 

%JOB_END - ****PASSED**** Channel_Board_DIB Module Check of slot(s) 0, 1 at 11:54:32 AM

- PASS slot 0 (S/N )

- PASS slot 1 (S/N )

 

%JOB_START - Beginning Relay_Board_Lower Module Check test on slot(s) 0,1 at 11:54:43 AM on

1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Beginning Relay Brd Lower Chans

- Relay Brd Lower Chans - PE Close & BPMU Close slot0 - Passed

- Relay Brd Lower Chans - PE Close & BPMU Close slot1 - Passed

- Relay Brd Lower Chans - PE Open & BPMU Close slot0 - Passed

- Relay Brd Lower Chans - PE Open & BPMU Close slot1 - Passed

- Relay Brd Lower Chans - PE Close & BPMU Open slot0 - Passed

- Relay Brd Lower Chans - PE Close & BPMU Open slot1 - Passed

- Finished Relay Brd Lower Chans

- Completed Relay_Board_Lower test on slot 1

 

%JOB_END - ****PASSED**** Relay_Board_Lower Module Check of slot(s) 0, 1 at 11:54:47 AM

- PASS slot 0

- PASS slot 1

 

%JOB_START - Beginning Relay_Board_Upper Module Check test on slot(s) 0,1 at 11:54:58 AM on

1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Beginning Relay Brd Upper Chans

- Relay Brd Upper Chans - PE Close & BPMU Close slot0 - Passed

- Relay Brd Upper Chans - PE Close & BPMU Close slot1 - Passed

- Relay Brd Upper Chans - PE Open & BPMU Close slot0 - Passed

- Relay Brd Upper Chans - PE Open & BPMU Close slot1 - Passed

- Relay Brd Upper Chans - PE Close & BPMU Open slot0 - Passed

- Relay Brd Upper Chans - PE Close & BPMU Open slot1 - Passed

- Finished Relay Brd Upper Chans

- Completed Relay_Board_Upper test on slot 1

 

%JOB_END - ****PASSED**** Relay_Board_Upper Module Check of slot(s) 0, 1 at 11:55:02 AM

- PASS slot 0

- PASS slot 1

 

%JOB_START - Beginning DPS_DIB Module Check test on slot 22 at 11:55:15 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- The license of DPS_MOUT is not available.

- DPS_MOUT Check Skipped.

 

%JOB_END - ****PASSED**** DPS_DIB Module Check of slot 22 (S/N:) at 11:55:25 AM

 

%JOB_START - Beginning ICUA Module Check test on slot 2 at 11:55:37 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting dib_test

- ICUA-2 P/N:51742601 Rev:738B S/N:4

- %INFO -- ADM on ICUA-2 Chan0 Slot2, ADM P/N:51740520 Rev:735C S/N:

- %INFO -- ADM on ICUA-2 Chan1 Slot2, ADM P/N:51740520 Rev:735C S/N:

- %INFO -- ADM on ICUA-2 Chan2 Slot2, ADM P/N:51740520 Rev:735C S/N:

- %INFO -- ADM on ICUA-2 Chan3 Slot2, ADM P/N:51740520 Rev:735C S/N:

- ICUA-2 Relay board P/N:51742800 Rev:515C S/N:

 

- *** Start to test on Multi PC Environment ***

- [Check the existence of Giga-Channel on PCs]

- ImagePC#0

- [Overlap Check Giga-Channel NodeID on Image Processing PC]

 

- -- Check on Token Link Connection

- Starting PG_History_Ram

- Completed PG_History_Ram

- Starting PG_Svm_Ram

- Completed PG_Svm_Ram

- Starting PG_Scramble_Ram, ADSS

- Completed PG_Scramble_Ram

- Starting PG_Scramble_Ram, Tset

- Completed PG_Scramble_Ram

- Starting PG_LVM_BIST_Ram (up to 32 sec)

- Completed PG_LVM_BIST_Ram in 21.6 sec

 

- %INFO - LRS Off

- Starting TG Register Tests...

- Completed TG Register Tests

- Starting ICUA_TG_Period_Ram...

- Completed ICUA_TG_Period_Ram

- Starting ICUA_TG_Period_Map_Ram...

- Completed TG_Period_Map_Ram

- Starting TG_LVM_BIST_Ram (up to 32 sec)

- Completed TG_LVM_BIST_Ram in 10.8 sec

- Starting ICUA_TG_History_Ram

- Completed ICUA_TG_History_Ram

- Starting ICUA_TG_SVM_Ram

- Completed ICUA_TG_SVM_Ram

- Starting ICUA_TG_ADSS_Ram

- Completed ICUA_TG_ADSS_Ram

- Starting ICUA_TG_KeepAlive_Ram

- Completed ICUA_TG_KeepAlive_Ram

- Starting ICUA_TG_Tset_LkDwn_Ram

- Completed ICUA_TG_Tset_LkDwn_Ram

- Starting ICUA_TG_Edge_Ram

- Completed ICUA_TG_Edge_Ram

- Starting ICUA_TG_Format_Ram

- Completed ICUA_TG_Format_Ram

- Starting ICUA_TG_FormatLkDwn_Ram

- Completed ICUA_TG_FormatLkDwn_Ram

- %INFO - LRS On

 

- Starting ICUA MEM & MOV FPGA Registers...

- [ICUA Global IDL Register Check]

- [ICUA Channel Select IDL Register Check - Chan0]

- [Data Transfer and Giga Channel Control Register Check - Chan0]

- [ICUA Channel Select IDL Register Check - Chan1]

- [Data Transfer and Giga Channel Control Register Check - Chan1]

- [ICUA Channel Select IDL Register Check - Chan2]

- [Data Transfer and Giga Channel Control Register Check - Chan2]

- [ICUA Channel Select IDL Register Check - Chan3]

- [Data Transfer and Giga Channel Control Register Check - Chan3]

- [Data Transfer and Giga Channel Control Register Check]

- Completed ICUA MEM & MOV FPGA Registers

 

- Starting PPMU FPGA Registers

- Completed PPMU FPGA Registers

 

- Start ICUA board SDRAM/SVM Check

- Start ICUA SDRAM Check...

- [Data Uniqueness Test]

- [Address Uniqueness Test]

- [Data Dump Test(1K)]

- Completed ICUA SDRAM Check

- Start ICUA SVM Check...

- [Data Uniqueness Test]

- [Address Uniqueness Test]

- [Data Dump Test(1K)]

- Completed ICUA SVM Check

- Completed ICUA board SDRAM/SVM check

 

- Start ICUA board Download check...

- [1k words Download check]

- [Download SDRAM source address uniqueness check]

- [Download SVM destination address uniqueness check]

- [Up to 1k words Download check]

- Completed ICUA board Download check

 

- Starting Pin PMU Checker on ICUA...

- Performing PPMU force voltage tests...

- Completed PPMU force voltage tests

- Performing PPMU measure voltage tests...

- Completed PPMU measure voltage tests

- Performing PPMU force current tests...

- Completed PPMU force current tests

- Performing PPMU measure current tests...

- Completed PPMU measure current tests

- Performing PPMU list and ram tests...

- Completed PPMU list and ram tests

- Completed Pin PMU Checker on ICUA.

 

- Beginning Reference DAC test

- Completed Reference DAC test

 

- Starting State Bus test

- Statebus : Checking STB lines : Normal mode, 30MHz

- Statebus : Checking STB lines : Normal mode, 50MHz

- Statebus : Checking STB lines : Normal mode, 80MHz

- Statebus : Checking STB lines : Normal mode, 100MHz

- Statebus : Checking State number lines : Extended mode, 25MHz

- Statebus : Checking State number lines : Extended mode, 30MHz

- Statebus : Checking State number lines : Extended mode, 50MHz

- Completed State Bus test

 

- Starting KeepAlive Test, Extended Mode

- Continuing KeepAlive test

- Continuing KeepAlive test

- Completed KeepAlive test.

- Starting KeepAlive Test, Normal Mode

- Continuing KeepAlive test

- Continuing KeepAlive test

- Completed KeepAlive test.

 

- Start Capture Test [Checker Mode]...

- [Capture Test]

- [Capture Test(All Channel Capture)]

- [Accumulate Test]

- Completed Capture Test [Checker Mode]

 

- Start ADM Module Check....

- [Check ADM at ADM Channel = 0]

- [ADM Power Supply Voltage Check]

- [ADM Capture Bank check]

- [Offset Adjust check] (ADM 50M-A/D Converter Capture)

- [Offset Adjust check] (ADM 25M-A/D Converter Capture)

- [Input Voltage Range Test]

- [ADM Post-CDS Amp check]

- [ADM OffsetRemover Dac check]

- [ADM Optical Black Remover Dac check]

- [ADM CDS Circuit Test]

- [ADM LineClamp Circuit Test]

- [Check ADM at ADM Channel = 1]

- [ADM Power Supply Voltage Check]

- [ADM Capture Bank check]

- [Offset Adjust check] (ADM 50M-A/D Converter Capture)

- [Offset Adjust check] (ADM 25M-A/D Converter Capture)

- [Input Voltage Range Test]

- [ADM Post-CDS Amp check]

- [ADM OffsetRemover Dac check]

- [ADM Optical Black Remover Dac check]

- [ADM CDS Circuit Test]

- [ADM LineClamp Circuit Test]

- [Check ADM at ADM Channel = 2]

- [ADM Power Supply Voltage Check]

- [ADM Capture Bank check]

- [Offset Adjust check] (ADM 50M-A/D Converter Capture)

- [Offset Adjust check] (ADM 25M-A/D Converter Capture)

- [Input Voltage Range Test]

- [ADM Post-CDS Amp check]

- [ADM OffsetRemover Dac check]

- [ADM Optical Black Remover Dac check]

- [ADM CDS Circuit Test]

- [ADM LineClamp Circuit Test]

- [Check ADM at ADM Channel = 3]

- [ADM Power Supply Voltage Check]

- [ADM Capture Bank check]

- [Offset Adjust check] (ADM 50M-A/D Converter Capture)

- [Offset Adjust check] (ADM 25M-A/D Converter Capture)

- [Input Voltage Range Test]

- [ADM Post-CDS Amp check]

- [ADM OffsetRemover Dac check]

- [ADM Optical Black Remover Dac check]

- [ADM CDS Circuit Test]

- [ADM LineClamp Circuit Test]

- Completed ADM Module Check

 

- Beginning Utility Bit test...

 

- Completed Utility Bit test

 

 

- == Running with Image Processing PC(IMGPC0) only for Data Transfer Tests ==

- Start ICUA board Giga Channel data transfer check...

- [Acquire function check without averaging]

- 32-bit data transfer check

- [Acquire function check with averaging]

- -- 16bit GAIN bit check

- -- 24bit data divide check

- Completed ICUA board Giga Channel data transfer check

 

- Start APC-485T FIFO Check ...

- [Memory Size: 16777216 Bytes]

- Completed APC-485T FIFO Check

 

- Start APM-425T CheckSum Bit Check...

- 32-bit data transfer and all checksum bit check

- Completed APM-425T CheckSum Bit Check...

 

- Start ICUA board SDRAM stuck failure check...

- [SDRAM stuck @1 check(16M)]

- [--Check Bank A--]

- [--Check Bank B--]

- [--Check Bank C--]

- [SDRAM stuck @0 check(16M)]

- [--Check Bank C--]

- [--Check Bank B--]

- [--Check Bank A--]

- Completed ICUA board SDRAM stuck failure check

 

- Completed ICUA Module Check 114.8 sec

 

%JOB_END - ****PASSED**** ICUA Module Check of slot 2 (S/N:) at 11:57:32 AM

 

%JOB_START - Beginning APMU Module Check test on slot 5 at 11:57:45 AM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxxxxxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_E (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting APMU PG test

- Starting PG_History_Ram

- Completed PG_History_Ram

- Starting PG_Svm_Ram

- Completed PG_Svm_Ram

- Starting PG_Scramble_Ram, ADSS

- Completed PG_Scramble_Ram

- Starting PG_Scramble_Ram, Tset

- Completed PG_Scramble_Ram

- Starting PG_LVM_BIST_Ram (up to 32 sec)

- Completed PG_LVM_BIST_Ram in 21.6 sec

- Completed APMU PG test

-

- Starting APMU IDPROM test

- APMU Mother Board - P/N:51740001 Rev:1012A S/N: xxxxxxxx

- APMU Relay Board - P/N:51740200 Rev:2060 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 24

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- Completed APMU IDPROM test

-

- Starting APMU Register test

- Starting APMU Misc FPGA Register test

- Completed APMU Misc FPGA Register test

- Starting APMU Control FPGA Register test

- Completed APMU Control FPGA Register test

- Completed APMU Register test

-

- Starting APMU Thermal meter test

- Completed APMU Thermal meter test

-

- Starting APMU Voltages test

- Completed APMU Voltages test

-

- Start APMU Reference DAC test

- Complete APMU Reference DAC test

-

- Starting APMU Relay test

- Starting -VMBUS_H- test

- Completed -VMBUS_H- test

- Starting -VMBUS_L- test

- Completed -VMBUS_L- test

- Starting -CALBUS_HS- test

- Completed -CALBUS_HS- test

- Starting -CalBUS resistor- test

- Completed -CalBUS resistor- test

- Starting -HF_OUT- test

- Completed -HF_OUT- test

- Starting -GNG_HF- test

- Completed -GNG_HF- test

- Starting -Force and Sense setting- test

- Completed -Force and Sense setting- test

- Completed APMU Relay test

 

- Starting APMU Analog function test

- Starting -Gate Control- test

- Completed -Gate Control- test

- Starting -Parallel Site- test

- Completed -Parallel Site- test

- Starting -Differential Voltage Meter- test

- Completed -Differential Voltage Meter- test

- Starting -MV mode- test

- Completed -MV mode- test

- Starting -FV mode- test

- Completed -FV mode- test

- Starting -MI mode- test

- Completed -MI mode- test

- Starting -FI mode- test

- Completed -FI mode- test

- Starting -Clamp I mode- test

- Completed -Clamp I mode- test

- Starting -Clamp V mode- test

- Completed -Clamp V mode- test

- Starting -Gang_FV(8ch) mode- test

- Completed -Gang_FV(8ch) mode- test

- Starting -Gang_FI(8ch) mode- test

- Completed -Gang_FI(8ch) mode- test

- Starting -Gang_FV(2ch) mode- test

- Completed -Gang_FV(2ch) mode- test

- Starting -Gang_FI(2ch) mode- test

- Completed -Gang_FI(2ch) mode- test

- Starting -DGS Test-

- Completed -DGS Test-

- Completed APMU Analog function test

 

- Starting APMU Memory test

- Starting APMU Misc FPGA -Relay Data Memory- test

- Completed APMU Misc FPGA -Relay Data Memory- test

- Starting APMU Misc FPGA -Volt Meter Memory- test

- Completed APMU Misc FPGA -Volt Meter Memory- test

- Starting APMU Control FPGA -Source/Capture Memory- test

- Starting FPGA_0

- Completed FPGA_0

- Starting FPGA_1

- Completed FPGA_1

- Starting FPGA_2

- Completed FPGA_2

- Starting FPGA_3

- Completed FPGA_3

- Starting FPGA_4

- Completed FPGA_4

- Starting FPGA_5

- Completed FPGA_5

- Starting FPGA_6

- Completed FPGA_6

- Starting FPGA_7

- Completed FPGA_7

- Completed APMU Control FPGA -Source/Capture Memory- test

- Completed APMU Memory test

-

 

%JOB_END - ****PASSED**** APMU Module Check of slot 5 (S/N:xxxxxxxx) at 12:00:02 PM

 

 

%JOB_START - Beginning Channel_Board Performance Verification test on slot(s) 0,1 at 12:07:02 PM

on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Beginning ID PROM Check

- Channel Board in Slot 0: Serial #:C156F35 Rev Date:1142B

- TERM. Rider in Slot 0: Serial #:C184A1B Rev Date:838A

- Channel Board in Slot 1: Serial #:C15686F Rev Date:1113B

- TERM. Rider in Slot 1: Serial #:C17D0E8 Rev Date:838A

- Finished ID-PROM Check on all slots

- Starting DCPV on slot 0

- Performing VIH/VIL level tests... at DGS=0mV

- Performing IOH/IOL level tests... at DGS=0mV

- Performing VT level tests... at DGS=0mV

- Performing Clamp level tests... at DGS=0mV

- Performing VOH/VOL level tests... at DGS=0mV

- Performing PPMU force voltage tests... at DGS=0mV

- Performing PPMU measure voltage tests... at DGS=0mV

- Performing PPMU force current tests... at DGS=0mV

- Performing PPMU measure current tests... DGS=0mV

- Performing Legacy High Voltage Channel level tests...

- Performing Fast High Voltage DC Level Tests...

- Starting BPMU Performance Verification on slot 0, DGS= 78.201 uV

- Verifying BPMU Forced Voltage Accuracy

- Verifying BPMU Voltage Measure Accuracy

- Verifying BPMU Forced Current Accuracy

- Verifying BPMU Current Measure Accuracy

- Verifying BPMU Voltage Clamping Accuracy

- Verifying BPMU Current Clamping Accuracy

 

- Finished BPMU Performance Verification on slot 0

 

- Finished DCPV on slot 0

- Starting DCPV on slot 1

- Performing VIH/VIL level tests... at DGS=0mV

- Performing IOH/IOL level tests... at DGS=0mV

- Performing VT level tests... at DGS=0mV

- Performing Clamp level tests... at DGS=0mV

- Performing VOH/VOL level tests... at DGS=0mV

- Performing PPMU force voltage tests... at DGS=0mV

- Performing PPMU measure voltage tests... at DGS=0mV

- Performing PPMU force current tests... at DGS=0mV

- Performing PPMU measure current tests... DGS=0mV

- Performing Legacy High Voltage Channel level tests...

- Performing Fast High Voltage DC Level Tests...

- Starting BPMU Performance Verification on slot 1, DGS= 2.571 mV

- Verifying BPMU Forced Voltage Accuracy

- Verifying BPMU Voltage Measure Accuracy

- Verifying BPMU Forced Current Accuracy

- Verifying BPMU Current Measure Accuracy

- Verifying BPMU Voltage Clamping Accuracy

- Verifying BPMU Current Clamping Accuracy

 

- Finished BPMU Performance Verification on slot 1

 

- Finished DCPV on slot 1

- All Tests Finished

 

%JOB_END - ****PASSED**** Channel_Board Performance Verification of slot(s) 0, 1 at 12:23:34 PM

- PASS slot 0 (S/N )

- PASS slot 1 (S/N )

 

%JOB_START - Beginning DPS_DIB Performance Verification test on slot 22 at 12:23:47 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N 3 Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting DPS Performance Verification on slot 22

 

- Verifying DPS Voltage Accuracy

- Verifying DPS Current Limit Accuracy

- Verifying DPS Current Measure Accuracy

- Channel 0

- Channel 1

- Channel 2

- Channel 3

- Channel 4

- Channel 5

- Channel 6

- Channel 7

- The license of DPS_MOUT is not available.

- DPS_MOUT Check Skipped.

 

- Finished DPS Performance Verification on slot 22

 

 

%JOB_END - ****PASSED**** DPS_DIB Performance Verification of slot 22 (S/N:C) at 12:24:18 PM

 

%JOB_START - Beginning APMU Performance Verification test on slot 5 at 12:24:30 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting APMU Performance Verification on slot 5

- Starting APMU IDPROM test

- APMU Mother Board - P/N:51740001 Rev:1012A S/N:

- APMU Relay Board - P/N:51740200 Rev:2060 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2

- Completed APMU IDPROM test

-

- Completed APMU REFDATA Load

-

- Verifying APMU VREF Offset Accuracy

- Verifying APMU Differential Voltmeter Accuracy

- Verifying APMU Voltage Measure Accuracy

- Verifying APMU Force Current/Voltage Measure Accuracy

- Verifying APMU Force Voltage Accuracy

- Verifying APMU Current Measure 200nA Accuracy

- Verifying APMU Current Measure Accuracy

- Verifying APMU Force Current Accuracy

- Verifying APMU Current Clamp Accuracy

- Verifying APMU Voltage Clamp Accuracy

- Verifying APMU Ganged Force Voltage Accuracy

- Verifying APMU Ganged Force Current Accuracy

-

- Finished APMU Performance Verification on slot 5

-

 

%JOB_END - ****PASSED**** APMU Performance Verification of slot 5 (S/N:) at 12:27:18 PM

 

%JOB_START - Beginning ICUA Performance Verification test on slot 2 at 12:27:31 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_ (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting dib_test

- ICUA-2 P/N:51742601 Rev:738B S/N:

- %INFO -- ADM on ICUA-2 Chan0 Slot2, ADM P/N:51740520 Rev:735C S/N:

- %INFO -- ADM on ICUA-2 Chan1 Slot2, ADM P/N:51740520 Rev:735C S/N:

- %INFO -- ADM on ICUA-2 Chan2 Slot2, ADM P/N:51740520 Rev:735C S/N:

- %INFO -- ADM on ICUA-2 Chan3 Slot2, ADM P/N:51740520 Rev:735C S/N:

- ICUA-2 Relay board P/N:51742800 Rev:515C S/N:

 

- *** Start to test on Multi PC Environment ***

 

- -- Check on Token Link Connection

- [Performance Check ADM at ICUA Chan 0]

 

- [ADM Power Supply Voltage Check]

 

- [ADM InputRange Performance Check](A/D Converter 25MHz)

- -- Voltage Range = 8V --

- -- Voltage Range = 4V --

- -- Voltage Range = 2V --

- -- Voltage Range = 1V --

- -- Voltage Range = 500mV --

- -- Voltage Range = 200mV --

- -- Voltage Range = 100mV --

- -- Voltage Range = 50mV --

- -- Voltage Range = 20mV --

- -- Voltage Range = 10mV --

 

- [ADM InputRange Performance Check](A/D Converter 50MHz)

- -- Voltage Range = 8V --

- -- Voltage Range = 4V --

- -- Voltage Range = 2V --

- -- Voltage Range = 1V --

- -- Voltage Range = 500mV --

- -- Voltage Range = 200mV --

- -- Voltage Range = 100mV --

- -- Voltage Range = 50mV --

- -- Voltage Range = 20mV --

- -- Voltage Range = 10mV --

 

- [ADM PostAmp Performance Check]

- (A/D Converter 25MHz)

 

- [ADM PostAmp Performance Check]

- (A/D Converter 50MHz)

 

- [ADM Offset D/A Converter Performance Check]

- (A/D Converter 25MHz)

 

- [ADM Offset D/A Converter Performance Check]

- (A/D Converter 50MHz)

 

- [ADM OpticalBlackRemover D/A Converter Performance Check]

- (A/D Converter 25MHz)

 

- [ADM OpticalBlackRemover D/A Converter Performance Check]

- (A/D Converter 50MHz)

 

- [ADM A/D Converter-25M Check]

- @25MHz

- @10MHz

- @5MHz

- @1MHz

- @500kHz

 

- [ADM A/D Converter-50M Check]

- @10MHz

- @25MHz

- @50MHz

 

- [ADM CDS Circuit Test]

- @10MHz(A/D Converter 25MHz)

- @5MHz(A/D Converter 25MHz)

- @1MHz(A/D Converter 25MHz)

- @500kHz(A/D Converter 25MHz)

- @100kHz(A/D Converter 25MHz)

 

- [ADM CDS Circuit Test]

- @10MHz(A/D Converter 50MHz)

- @25MHz(A/D Converter 50MHz)

- @50MHz(A/D Converter 50MHz)

 

- [ADM LineClamp Circuit Performance Test]

- @1MHz(A/D Converter 25MHz)

- @2MHz(A/D Converter 25MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 25MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 25MHz)

- (CDS On)

 

- [ADM Ground Level Noise Check](A/D Converter 50MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 50MHz)

- (CDS On)

 

- [Performance Check ADM at ICUA Chan 1]

 

- [ADM Power Supply Voltage Check]

 

- [ADM InputRange Performance Check](A/D Converter 25MHz)

- -- Voltage Range = 8V --

- -- Voltage Range = 4V --

- -- Voltage Range = 2V --

- -- Voltage Range = 1V --

- -- Voltage Range = 500mV --

- -- Voltage Range = 200mV --

- -- Voltage Range = 100mV --

- -- Voltage Range = 50mV --

- -- Voltage Range = 20mV --

- -- Voltage Range = 10mV --

 

- [ADM InputRange Performance Check](A/D Converter 50MHz)

- -- Voltage Range = 8V --

- -- Voltage Range = 4V --

- -- Voltage Range = 2V --

- -- Voltage Range = 1V --

- -- Voltage Range = 500mV --

- -- Voltage Range = 200mV --

- -- Voltage Range = 100mV --

- -- Voltage Range = 50mV --

- -- Voltage Range = 20mV --

- -- Voltage Range = 10mV --

 

- [ADM PostAmp Performance Check]

- (A/D Converter 25MHz)

 

- [ADM PostAmp Performance Check]

- (A/D Converter 50MHz)

 

- [ADM Offset D/A Converter Performance Check]

- (A/D Converter 25MHz)

 

- [ADM Offset D/A Converter Performance Check]

- (A/D Converter 50MHz)

 

- [ADM OpticalBlackRemover D/A Converter Performance Check]

- (A/D Converter 25MHz)

 

- [ADM OpticalBlackRemover D/A Converter Performance Check]

- (A/D Converter 50MHz)

 

- [ADM A/D Converter-25M Check]

- @25MHz

- @10MHz

- @5MHz

- @1MHz

- @500kHz

 

- [ADM A/D Converter-50M Check]

- @10MHz

- @25MHz

- @50MHz

 

- [ADM CDS Circuit Test]

- @10MHz(A/D Converter 25MHz)

- @5MHz(A/D Converter 25MHz)

- @1MHz(A/D Converter 25MHz)

- @500kHz(A/D Converter 25MHz)

- @100kHz(A/D Converter 25MHz)

 

- [ADM CDS Circuit Test]

- @10MHz(A/D Converter 50MHz)

- @25MHz(A/D Converter 50MHz)

- @50MHz(A/D Converter 50MHz)

 

- [ADM LineClamp Circuit Performance Test]

- @1MHz(A/D Converter 25MHz)

- @2MHz(A/D Converter 25MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 25MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 25MHz)

- (CDS On)

 

- [ADM Ground Level Noise Check](A/D Converter 50MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 50MHz)

- (CDS On)

 

- [Performance Check ADM at ICUA Chan 2]

 

- [ADM Power Supply Voltage Check]

 

- [ADM InputRange Performance Check](A/D Converter 25MHz)

- -- Voltage Range = 8V --

- -- Voltage Range = 4V --

- -- Voltage Range = 2V --

- -- Voltage Range = 1V --

- -- Voltage Range = 500mV --

- -- Voltage Range = 200mV --

- -- Voltage Range = 100mV --

- -- Voltage Range = 50mV --

- -- Voltage Range = 20mV --

- -- Voltage Range = 10mV --

 

- [ADM InputRange Performance Check](A/D Converter 50MHz)

- -- Voltage Range = 8V --

- -- Voltage Range = 4V --

- -- Voltage Range = 2V --

- -- Voltage Range = 1V --

- -- Voltage Range = 500mV --

- -- Voltage Range = 200mV --

- -- Voltage Range = 100mV --

- -- Voltage Range = 50mV --

- -- Voltage Range = 20mV --

- -- Voltage Range = 10mV --

 

- [ADM PostAmp Performance Check]

- (A/D Converter 25MHz)

 

- [ADM PostAmp Performance Check]

- (A/D Converter 50MHz)

 

- [ADM Offset D/A Converter Performance Check]

- (A/D Converter 25MHz)

 

- [ADM Offset D/A Converter Performance Check]

- (A/D Converter 50MHz)

 

- [ADM OpticalBlackRemover D/A Converter Performance Check]

- (A/D Converter 25MHz)

 

- [ADM OpticalBlackRemover D/A Converter Performance Check]

- (A/D Converter 50MHz)

 

- [ADM A/D Converter-25M Check]

- @25MHz

- @10MHz

- @5MHz

- @1MHz

- @500kHz

 

- [ADM A/D Converter-50M Check]

- @10MHz

- @25MHz

- @50MHz

 

- [ADM CDS Circuit Test]

- @10MHz(A/D Converter 25MHz)

- @5MHz(A/D Converter 25MHz)

- @1MHz(A/D Converter 25MHz)

- @500kHz(A/D Converter 25MHz)

- @100kHz(A/D Converter 25MHz)

 

- [ADM CDS Circuit Test]

- @10MHz(A/D Converter 50MHz)

- @25MHz(A/D Converter 50MHz)

- @50MHz(A/D Converter 50MHz)

 

- [ADM LineClamp Circuit Performance Test]

- @1MHz(A/D Converter 25MHz)

- @2MHz(A/D Converter 25MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 25MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 25MHz)

- (CDS On)

 

- [ADM Ground Level Noise Check](A/D Converter 50MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 50MHz)

- (CDS On)

 

- [Performance Check ADM at ICUA Chan 3]

 

- [ADM Power Supply Voltage Check]

 

- [ADM InputRange Performance Check](A/D Converter 25MHz)

- -- Voltage Range = 8V --

- -- Voltage Range = 4V --

- -- Voltage Range = 2V --

- -- Voltage Range = 1V --

- -- Voltage Range = 500mV --

- -- Voltage Range = 200mV --

- -- Voltage Range = 100mV --

- -- Voltage Range = 50mV --

- -- Voltage Range = 20mV --

- -- Voltage Range = 10mV --

 

- [ADM InputRange Performance Check](A/D Converter 50MHz)

- -- Voltage Range = 8V --

- -- Voltage Range = 4V --

- -- Voltage Range = 2V --

- -- Voltage Range = 1V --

- -- Voltage Range = 500mV --

- -- Voltage Range = 200mV --

- -- Voltage Range = 100mV --

- -- Voltage Range = 50mV --

- -- Voltage Range = 20mV --

- -- Voltage Range = 10mV --

 

- [ADM PostAmp Performance Check]

- (A/D Converter 25MHz)

 

- [ADM PostAmp Performance Check]

- (A/D Converter 50MHz)

 

- [ADM Offset D/A Converter Performance Check]

- (A/D Converter 25MHz)

 

- [ADM Offset D/A Converter Performance Check]

- (A/D Converter 50MHz)

 

- [ADM OpticalBlackRemover D/A Converter Performance Check]

- (A/D Converter 25MHz)

 

- [ADM OpticalBlackRemover D/A Converter Performance Check]

- (A/D Converter 50MHz)

 

- [ADM A/D Converter-25M Check]

- @25MHz

- @10MHz

- @5MHz

- @1MHz

- @500kHz

 

- [ADM A/D Converter-50M Check]

- @10MHz

- @25MHz

- @50MHz

 

- [ADM CDS Circuit Test]

- @10MHz(A/D Converter 25MHz)

- @5MHz(A/D Converter 25MHz)

- @1MHz(A/D Converter 25MHz)

- @500kHz(A/D Converter 25MHz)

- @100kHz(A/D Converter 25MHz)

 

- [ADM CDS Circuit Test]

- @10MHz(A/D Converter 50MHz)

- @25MHz(A/D Converter 50MHz)

- @50MHz(A/D Converter 50MHz)

 

- [ADM LineClamp Circuit Performance Test]

- @1MHz(A/D Converter 25MHz)

- @2MHz(A/D Converter 25MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 25MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 25MHz)

- (CDS On)

 

- [ADM Ground Level Noise Check](A/D Converter 50MHz)

 

- [ADM Ground Level Noise Check](A/D Converter 50MHz)

- (CDS On)

 

- Starting Pin PMU Checker on ICUA...

- Performing PPMU force voltage tests...

- Completed PPMU force voltage tests

- Performing PPMU measure voltage tests...

- Completed PPMU measure voltage tests

- Performing PPMU force current tests...

- Completed PPMU force current tests

- Performing PPMU measure current tests...

- Completed PPMU measure current tests

- Completed Pin PMU Checker on ICUA.

 

- Completed ICUA Performance Check 137.6 sec

 

%JOB_END - ****PASSED**** ICUA Performance Verification of slot 2 (S/N:) at 12:29:48 PM

 

 

%JOB_START - Beginning PCIT Quick Check test on slot 0 at 12:02:00 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_xxxE (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- PCIT CARD INFORMATION:

Part Number: 605-452-21

Serial Number: xxx

Revision Date: 1049A

TCIT FPGA Version: 20101005

 

- Starting PCIT Register test

- Completed PCIT Register test

- Starting PCIT Free Running Timer test

- Completed PCIT Free Running Timer test

- Starting PCIT Retriggerable Timer 1 test

- Completed PCIT Retriggerable Timer 1 test

- Starting PCIT Retriggerable Timer 2 test

- Completed PCIT Retriggerable Timer 2 test

- Starting TCIT FPGA Version test

- Completed TCIT FPGA Version test

- Starting PCIT DMA Test to CUB PG_History_Ram test using DMA mode

- Test with DMA bypass = TRUE

- Test with DMA bypass = FALSE

- Completed PCIT DMA Test to CUB PG_History_Ram test using DMA mode

 

%JOB_END - ****PASSED**** PCIT Quick Check of slot 18 (S/N:xxx) at 12:02:13 PM

 

%JOB_START - Beginning CUB Quick Check test on slot 18 at 12:02:26 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_xxxE (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting DIB Power Tests

- Completed DIB Power Tests

- Starting System Fan Checks

- Completed System Fan Checks

- Starting PG_History_Ram

- Completed PG_History_Ram

- Starting PG_Svm_Ram

- Completed PG_Svm_Ram

- Starting PG_History_Ram using DMA mode

- Completed PG_History_Ram using DMA mode

- Starting PG_Svm_Ram using DMA mode

- Completed PG_Svm_Ram using DMA mode

- Starting PG_Scramble_Ram, ADSS

- Completed PG_Scramble_Ram

- Starting PG_Scramble_Ram, Tset

- Completed PG_Scramble_Ram

- Skipping PG_LVM_BIST_Ram

- Beginning Qck_Register Test

- Completed Qck_Register Test

- Starting CalCub_TG_Register Tests

- LRS Off

- LRS On

- Completed CalCub_TG_Register Tests

- Started IdProm Test

- Completed IdProm Test

- Beginning Force Voltage Test

- Completed Force Voltage Test

- Beginning TestRefToDac

- Completed TestRefToDac

- Starting the CalCubSLITest

- Completed the CalCubSLITest

 

%JOB_END - ****PASSED**** CUB Quick Check of slot 18 (S/N:C) at 12:02:36 PM

 

- Beginning Channel_Board test on all CB200 slots

%JOB_START - Beginning Channel_Board Quick Check test on slot(s) 0,1 at 12:02:49 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_xxxE (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Beginning ID PROM Check

- Channel Board in Slot 0: Serial #:C Rev Date:1142B

- TERM. Rider in Slot 0: Serial #:C Rev Date:838A

- Channel Board in Slot 1: Serial #:C Rev Date:1113B

- TERM. Rider in Slot 1: Serial #:C Rev Date:838A

- Finished ID-PROM Check on all slots

- Checking Board Temperatures

- Beginning CB200 Register Tests

- Testing slot 0

- Starting PG register tests

- *** PG Register Tests on Slot 0 passed

- Starting TG register tests

- *** TG 1 channel 0 on Slot 0 passed

- *** TG 1 channel 1 on Slot 0 passed

- *** TG 1 channel 2 on Slot 0 passed

- *** TG 1 channel 3 on Slot 0 passed

- *** TG 2 channel 4 on Slot 0 passed

- *** TG 2 channel 5 on Slot 0 passed

- *** TG 2 channel 6 on Slot 0 passed

- *** TG 2 channel 7 on Slot 0 passed

- *** TG 3 channel 8 on Slot 0 passed

- *** TG 3 channel 9 on Slot 0 passed

- *** TG 3 channel 10 on Slot 0 passed

- *** TG 3 channel 11 on Slot 0 passed

- *** TG 4 channel 12 on Slot 0 passed

- *** TG 4 channel 13 on Slot 0 passed

- *** TG 4 channel 14 on Slot 0 passed

- *** TG 4 channel 15 on Slot 0 passed

- *** TG 5 channel 16 on Slot 0 passed

- *** TG 5 channel 17 on Slot 0 passed

- *** TG 5 channel 18 on Slot 0 passed

- *** TG 5 channel 19 on Slot 0 passed

- *** TG 6 channel 20 on Slot 0 passed

- *** TG 6 channel 21 on Slot 0 passed

- *** TG 6 channel 22 on Slot 0 passed

- *** TG 6 channel 23 on Slot 0 passed

- *** TG 7 channel 24 on Slot 0 passed

- *** TG 7 channel 25 on Slot 0 passed

- *** TG 7 channel 26 on Slot 0 passed

- *** TG 7 channel 27 on Slot 0 passed

- *** TG 8 channel 28 on Slot 0 passed

- *** TG 8 channel 29 on Slot 0 passed

- *** TG 8 channel 30 on Slot 0 passed

- *** TG 8 channel 31 on Slot 0 passed

- *** TG 9 channel 32 on Slot 0 passed

- *** TG 9 channel 33 on Slot 0 passed

- *** TG 9 channel 34 on Slot 0 passed

- *** TG 9 channel 35 on Slot 0 passed

- *** TG 10 channel 36 on Slot 0 passed

- *** TG 10 channel 37 on Slot 0 passed

- *** TG 10 channel 38 on Slot 0 passed

- *** TG 10 channel 39 on Slot 0 passed

- *** TG 11 channel 40 on Slot 0 passed

- *** TG 11 channel 41 on Slot 0 passed

- *** TG 11 channel 42 on Slot 0 passed

- *** TG 11 channel 43 on Slot 0 passed

- *** TG 12 channel 44 on Slot 0 passed

- *** TG 12 channel 45 on Slot 0 passed

- *** TG 12 channel 46 on Slot 0 passed

- *** TG 12 channel 47 on Slot 0 passed

- *** TG 13 channel 48 on Slot 0 passed

- *** TG 13 channel 49 on Slot 0 passed

- *** TG 13 channel 50 on Slot 0 passed

- *** TG 13 channel 51 on Slot 0 passed

- *** TG 14 channel 52 on Slot 0 passed

- *** TG 14 channel 53 on Slot 0 passed

- *** TG 14 channel 54 on Slot 0 passed

- *** TG 14 channel 55 on Slot 0 passed

- *** TG 15 channel 56 on Slot 0 passed

- *** TG 15 channel 57 on Slot 0 passed

- *** TG 15 channel 58 on Slot 0 passed

- *** TG 15 channel 59 on Slot 0 passed

- *** TG 16 channel 60 on Slot 0 passed

- *** TG 16 channel 61 on Slot 0 passed

- *** TG 16 channel 62 on Slot 0 passed

- *** TG 16 channel 63 on Slot 0 passed

- Starting Dilbert register tests

- *** DILBERT FPGA Revision on slot 0 is: 12

- *** DILBERT Register Test on Slot 0 passed

- Starting Pequot register tests

- *** PEQUOT channel 0 on Slot 0 passed

- *** PEQUOT channel 1 on Slot 0 passed

- *** PEQUOT channel 2 on Slot 0 passed

- *** PEQUOT channel 3 on Slot 0 passed

- *** PEQUOT channel 4 on Slot 0 passed

- *** PEQUOT channel 5 on Slot 0 passed

- *** PEQUOT channel 6 on Slot 0 passed

- *** PEQUOT channel 7 on Slot 0 passed

- *** PEQUOT channel 8 on Slot 0 passed

- *** PEQUOT channel 9 on Slot 0 passed

- *** PEQUOT channel 10 on Slot 0 passed

- *** PEQUOT channel 11 on Slot 0 passed

- *** PEQUOT channel 12 on Slot 0 passed

- *** PEQUOT channel 13 on Slot 0 passed

- *** PEQUOT channel 14 on Slot 0 passed

- *** PEQUOT channel 15 on Slot 0 passed

- *** PEQUOT channel 16 on Slot 0 passed

- *** PEQUOT channel 17 on Slot 0 passed

- *** PEQUOT channel 18 on Slot 0 passed

- *** PEQUOT channel 19 on Slot 0 passed

- *** PEQUOT channel 20 on Slot 0 passed

- *** PEQUOT channel 21 on Slot 0 passed

- *** PEQUOT channel 22 on Slot 0 passed

- *** PEQUOT channel 23 on Slot 0 passed

- *** PEQUOT channel 24 on Slot 0 passed

- *** PEQUOT channel 25 on Slot 0 passed

- *** PEQUOT channel 26 on Slot 0 passed

- *** PEQUOT channel 27 on Slot 0 passed

- *** PEQUOT channel 28 on Slot 0 passed

- *** PEQUOT channel 29 on Slot 0 passed

- *** PEQUOT channel 30 on Slot 0 passed

- *** PEQUOT channel 31 on Slot 0 passed

- *** PEQUOT channel 32 on Slot 0 passed

- *** PEQUOT channel 33 on Slot 0 passed

- *** PEQUOT channel 34 on Slot 0 passed

- *** PEQUOT channel 35 on Slot 0 passed

- *** PEQUOT channel 36 on Slot 0 passed

- *** PEQUOT channel 37 on Slot 0 passed

- *** PEQUOT channel 38 on Slot 0 passed

- *** PEQUOT channel 39 on Slot 0 passed

- *** PEQUOT channel 40 on Slot 0 passed

- *** PEQUOT channel 41 on Slot 0 passed

- *** PEQUOT channel 42 on Slot 0 passed

- *** PEQUOT channel 43 on Slot 0 passed

- *** PEQUOT channel 44 on Slot 0 passed

- *** PEQUOT channel 45 on Slot 0 passed

- *** PEQUOT channel 46 on Slot 0 passed

- *** PEQUOT channel 47 on Slot 0 passed

- *** PEQUOT channel 48 on Slot 0 passed

- *** PEQUOT channel 49 on Slot 0 passed

- *** PEQUOT channel 50 on Slot 0 passed

- *** PEQUOT channel 51 on Slot 0 passed

- *** PEQUOT channel 52 on Slot 0 passed

- *** PEQUOT channel 53 on Slot 0 passed

- *** PEQUOT channel 54 on Slot 0 passed

- *** PEQUOT channel 55 on Slot 0 passed

- *** PEQUOT channel 56 on Slot 0 passed

- *** PEQUOT channel 57 on Slot 0 passed

- *** PEQUOT channel 58 on Slot 0 passed

- *** PEQUOT channel 59 on Slot 0 passed

- *** PEQUOT channel 60 on Slot 0 passed

- *** PEQUOT channel 61 on Slot 0 passed

- *** PEQUOT channel 62 on Slot 0 passed

- *** PEQUOT channel 63 on Slot 0 passed

- Testing slot 1

- Starting PG register tests

- *** PG Register Tests on Slot 1 passed

- Starting TG register tests

- *** TG 1 channel 0 on Slot 1 passed

- *** TG 1 channel 1 on Slot 1 passed

- *** TG 1 channel 2 on Slot 1 passed

- *** TG 1 channel 3 on Slot 1 passed

- *** TG 2 channel 4 on Slot 1 passed

- *** TG 2 channel 5 on Slot 1 passed

- *** TG 2 channel 6 on Slot 1 passed

- *** TG 2 channel 7 on Slot 1 passed

- *** TG 3 channel 8 on Slot 1 passed

- *** TG 3 channel 9 on Slot 1 passed

- *** TG 3 channel 10 on Slot 1 passed

- *** TG 3 channel 11 on Slot 1 passed

- *** TG 4 channel 12 on Slot 1 passed

- *** TG 4 channel 13 on Slot 1 passed

- *** TG 4 channel 14 on Slot 1 passed

- *** TG 4 channel 15 on Slot 1 passed

- *** TG 5 channel 16 on Slot 1 passed

- *** TG 5 channel 17 on Slot 1 passed

- *** TG 5 channel 18 on Slot 1 passed

- *** TG 5 channel 19 on Slot 1 passed

- *** TG 6 channel 20 on Slot 1 passed

- *** TG 6 channel 21 on Slot 1 passed

- *** TG 6 channel 22 on Slot 1 passed

- *** TG 6 channel 23 on Slot 1 passed

- *** TG 7 channel 24 on Slot 1 passed

- *** TG 7 channel 25 on Slot 1 passed

- *** TG 7 channel 26 on Slot 1 passed

- *** TG 7 channel 27 on Slot 1 passed

- *** TG 8 channel 28 on Slot 1 passed

- *** TG 8 channel 29 on Slot 1 passed

- *** TG 8 channel 30 on Slot 1 passed

- *** TG 8 channel 31 on Slot 1 passed

- *** TG 9 channel 32 on Slot 1 passed

- *** TG 9 channel 33 on Slot 1 passed

- *** TG 9 channel 34 on Slot 1 passed

- *** TG 9 channel 35 on Slot 1 passed

- *** TG 10 channel 36 on Slot 1 passed

- *** TG 10 channel 37 on Slot 1 passed

- *** TG 10 channel 38 on Slot 1 passed

- *** TG 10 channel 39 on Slot 1 passed

- *** TG 11 channel 40 on Slot 1 passed

- *** TG 11 channel 41 on Slot 1 passed

- *** TG 11 channel 42 on Slot 1 passed

- *** TG 11 channel 43 on Slot 1 passed

- *** TG 12 channel 44 on Slot 1 passed

- *** TG 12 channel 45 on Slot 1 passed

- *** TG 12 channel 46 on Slot 1 passed

- *** TG 12 channel 47 on Slot 1 passed

- *** TG 13 channel 48 on Slot 1 passed

- *** TG 13 channel 49 on Slot 1 passed

- *** TG 13 channel 50 on Slot 1 passed

- *** TG 13 channel 51 on Slot 1 passed

- *** TG 14 channel 52 on Slot 1 passed

- *** TG 14 channel 53 on Slot 1 passed

- *** TG 14 channel 54 on Slot 1 passed

- *** TG 14 channel 55 on Slot 1 passed

- *** TG 15 channel 56 on Slot 1 passed

- *** TG 15 channel 57 on Slot 1 passed

- *** TG 15 channel 58 on Slot 1 passed

- *** TG 15 channel 59 on Slot 1 passed

- *** TG 16 channel 60 on Slot 1 passed

- *** TG 16 channel 61 on Slot 1 passed

- *** TG 16 channel 62 on Slot 1 passed

- *** TG 16 channel 63 on Slot 1 passed

- Starting Dilbert register tests

- *** DILBERT FPGA Revision on slot 1 is: 12

- *** DILBERT Register Test on Slot 1 passed

- Starting Pequot register tests

- *** PEQUOT channel 0 on Slot 1 passed

- *** PEQUOT channel 1 on Slot 1 passed

- *** PEQUOT channel 2 on Slot 1 passed

- *** PEQUOT channel 3 on Slot 1 passed

- *** PEQUOT channel 4 on Slot 1 passed

- *** PEQUOT channel 5 on Slot 1 passed

- *** PEQUOT channel 6 on Slot 1 passed

- *** PEQUOT channel 7 on Slot 1 passed

- *** PEQUOT channel 8 on Slot 1 passed

- *** PEQUOT channel 9 on Slot 1 passed

- *** PEQUOT channel 10 on Slot 1 passed

- *** PEQUOT channel 11 on Slot 1 passed

- *** PEQUOT channel 12 on Slot 1 passed

- *** PEQUOT channel 13 on Slot 1 passed

- *** PEQUOT channel 14 on Slot 1 passed

- *** PEQUOT channel 15 on Slot 1 passed

- *** PEQUOT channel 16 on Slot 1 passed

- *** PEQUOT channel 17 on Slot 1 passed

- *** PEQUOT channel 18 on Slot 1 passed

- *** PEQUOT channel 19 on Slot 1 passed

- *** PEQUOT channel 20 on Slot 1 passed

- *** PEQUOT channel 21 on Slot 1 passed

- *** PEQUOT channel 22 on Slot 1 passed

- *** PEQUOT channel 23 on Slot 1 passed

- *** PEQUOT channel 24 on Slot 1 passed

- *** PEQUOT channel 25 on Slot 1 passed

- *** PEQUOT channel 26 on Slot 1 passed

- *** PEQUOT channel 27 on Slot 1 passed

- *** PEQUOT channel 28 on Slot 1 passed

- *** PEQUOT channel 29 on Slot 1 passed

- *** PEQUOT channel 30 on Slot 1 passed

- *** PEQUOT channel 31 on Slot 1 passed

- *** PEQUOT channel 32 on Slot 1 passed

- *** PEQUOT channel 33 on Slot 1 passed

- *** PEQUOT channel 34 on Slot 1 passed

- *** PEQUOT channel 35 on Slot 1 passed

- *** PEQUOT channel 36 on Slot 1 passed

- *** PEQUOT channel 37 on Slot 1 passed

- *** PEQUOT channel 38 on Slot 1 passed

- *** PEQUOT channel 39 on Slot 1 passed

- *** PEQUOT channel 40 on Slot 1 passed

- *** PEQUOT channel 41 on Slot 1 passed

- *** PEQUOT channel 42 on Slot 1 passed

- *** PEQUOT channel 43 on Slot 1 passed

- *** PEQUOT channel 44 on Slot 1 passed

- *** PEQUOT channel 45 on Slot 1 passed

- *** PEQUOT channel 46 on Slot 1 passed

- *** PEQUOT channel 47 on Slot 1 passed

- *** PEQUOT channel 48 on Slot 1 passed

- *** PEQUOT channel 49 on Slot 1 passed

- *** PEQUOT channel 50 on Slot 1 passed

- *** PEQUOT channel 51 on Slot 1 passed

- *** PEQUOT channel 52 on Slot 1 passed

- *** PEQUOT channel 53 on Slot 1 passed

- *** PEQUOT channel 54 on Slot 1 passed

- *** PEQUOT channel 55 on Slot 1 passed

- *** PEQUOT channel 56 on Slot 1 passed

- *** PEQUOT channel 57 on Slot 1 passed

- *** PEQUOT channel 58 on Slot 1 passed

- *** PEQUOT channel 59 on Slot 1 passed

- *** PEQUOT channel 60 on Slot 1 passed

- *** PEQUOT channel 61 on Slot 1 passed

- *** PEQUOT channel 62 on Slot 1 passed

- *** PEQUOT channel 63 on Slot 1 passed

- Finished CB200 Register Tests on all slots

- Beginning JTAG Bus Control

- *** JTAG Bus Controller Rev. on slot 0 is: 8

- JTAG Bus Control Port 0 - TDI Word 5 slot 0 passed

- DSMTO Rider Card Not Present on slot 0 - Port 1 Skipped

- *** JTAG Bus Controller Rev. on slot 1 is: 8

- JTAG Bus Control Port 0 - TDI Word 5 slot 1 passed

- DSMTO Rider Card Not Present on slot 1 - Port 1 Skipped

- Finished JTAG Bus Control on all slots

- Beginning PG LVM Short BIST test

- Finished on all slots

- Beginning TG LVM Short BIST test

- Finished on all slots

- Beginning PG Opcode test

- Beginning Basic PG Opcodes test

- Beginning Halt Opcode test

- Beginning Repeat Opcode, Minimum Value test

- Beginning Repeat Opcode, Maximum Value test

- Beginning Repeat Opcode test

- Beginning Change Repeat Opcode from the test program test

- Beginning Jump Opcode test

- Completed Basic PG Opcodes test

- Beginning Condition Flags PG Opcodes test

- Beginning burst_clear_flags test

- Beginning burst_setA test

- Beginning burst_enableA test

- Beginning burst_clearA test

- Beginning burst_setB test

- Beginning burst_enableB test

- Beginning burst_clearB test

- Beginning burst_setC test

- Beginning burst_enableC test

- Beginning burst_clearC test

- Beginning burst_setD test

- Beginning burst_enableD test

- Beginning burst_clearD test

- Beginning Jump PG Opcodes test

- Beginning burst_jmp test

- Beginning burst_nestjmp test

- Beginning burst_fnestjmp test

- Beginning burst_cndjmp test

- Beginning burst_negcndjmp test

- Beginning burst_clrcnd1jmp test

- Beginning burst_clrcnd2jmp test

- Beginning burst_glo_nstjmp test

- Beginning burst_glo_cndjmp test

- Beginning burst_glo_clrcndjmp test

- Beginning Call PG Opcodes test

- Beginning burst_call test

- Beginning burst_nestcall test

- Beginning burst_fnestcall test

- Beginning burst_cndcall test

- Beginning burst_negcndcall test

- Beginning burst_clrcnd1call test

- Beginning burst_clrcnd2call test

- Beginning burst_glo_call test

- Beginning burst_glo_cndcall test

- Beginning burst_glo_clrcndcall test

- Beginning burst_ccall test

- Beginning burst_ccall test

- Beginning burst_glo_clrcndjmp test

- Beginning Return PG Opcodes test

- Beginning burst_nestrtn test

- Beginning burst_cndrtn test

- Beginning burst_ncndrtn test

- Beginning burst_cndrtnclr test

- Beginning burst_glo_callrtn test

- Beginning Resume PG Opcodes test

- Beginning burst_resume test

- Beginning burst_cndresume test

- Beginning burst_cndresumeclr test

- Beginning Push & Pop PG Opcodes test

- Beginning burst_pushpop test

- Beginning burst_nstpushpop test

- Beginning burst_ovfpushpop test

- Beginning Loop PG Opcodes test

- Beginning burst_setloop test

- Beginning burst_loop test

- Beginning burst_maxloopA test

- Beginning burst_maxloopB test

- Beginning burst_maxloopC test

- Beginning burst_nstpushpop test

- Beginning burst_nestloop test

- Beginning burst_nestloop1 test

- Beginning burst_nestloop2 test

- Beginning burst_nestloop3 test

- Beginning burst_useloopB test

- Beginning burst_useloopC test

- Beginning burst_loop_init test

- Beginning burst_poploop test

- Beginning burst_nstpoploop test

- Beginning Exit Loop PG Opcodes test

- Beginning burst_exitloop test

- Beginning burst_cndexit test

- Beginning burst_ncndexit test

- Beginning burst_cndexitclr test

- Beginning burst_one Pat Gen, set_code

- Beginning Pat Gen, tl_PatgenClrCode

- Beginning burst_AAAA Pat Gen, set_code

- Beginning Pat Gen, clr_code

- Beginning burst_5555 Pat Gen, set_code

- Beginning Pat Gen, clr_code

- Beginning burst_zero Pat Gen, set_code

- Beginning Misc PG Opcodes test

- Beginning Halt End Module

- Beginning NOP End Module

- Beginning Fail Count

- Beginning Clear Fail

- Beginning Inhibit Fail Count

- Beginning Inhibit Cycle Count

- Beginning Mask

- Beginning Halt on Failure

- Beginning IGN Control Bit

- Beginning STV

- Beginning Basic PG Opcodes test

- Beginning Halt Opcode test

- Beginning Repeat Opcode, Minimum Value test

- Beginning Repeat Opcode, Maximum Value test

- Beginning Repeat Opcode test

- Beginning Change Repeat Opcode from the test program test

- Beginning Jump Opcode test

- Completed Basic PG Opcodes test

- Beginning Condition Flags PG Opcodes test

- Beginning burst_clear_flags test

- Beginning burst_setA test

- Beginning burst_enableA test

- Beginning burst_clearA test

- Beginning burst_setB test

- Beginning burst_enableB test

- Beginning burst_clearB test

- Beginning burst_setC test

- Beginning burst_enableC test

- Beginning burst_clearC test

- Beginning burst_setD test

- Beginning burst_enableD test

- Beginning burst_clearD test

- Beginning Jump PG Opcodes test

- Beginning burst_jmp test

- Beginning burst_nestjmp test

- Beginning burst_fnestjmp test

- Beginning burst_cndjmp test

- Beginning burst_negcndjmp test

- Beginning burst_clrcnd1jmp test

- Beginning burst_clrcnd2jmp test

- Beginning burst_glo_nstjmp test

- Beginning burst_glo_cndjmp test

- Beginning burst_glo_clrcndjmp test

- Beginning Call PG Opcodes test

- Beginning burst_call test

- Beginning burst_nestcall test

- Beginning burst_fnestcall test

- Beginning burst_cndcall test

- Beginning burst_negcndcall test

- Beginning burst_clrcnd1call test

- Beginning burst_clrcnd2call test

- Beginning burst_glo_call test

- Beginning burst_glo_cndcall test

- Beginning burst_glo_clrcndcall test

- Beginning burst_ccall test

- Beginning burst_ccall test

- Beginning burst_glo_clrcndjmp test

- Beginning Return PG Opcodes test

- Beginning burst_nestrtn test

- Beginning burst_cndrtn test

- Beginning burst_ncndrtn test

- Beginning burst_cndrtnclr test

- Beginning burst_glo_callrtn test

- Beginning Resume PG Opcodes test

- Beginning burst_resume test

- Beginning burst_cndresume test

- Beginning burst_cndresumeclr test

- Beginning Push & Pop PG Opcodes test

- Beginning burst_pushpop test

- Beginning burst_nstpushpop test

- Beginning burst_ovfpushpop test

- Beginning Loop PG Opcodes test

- Beginning burst_setloop test

- Beginning burst_loop test

- Beginning burst_maxloopA test

- Beginning burst_maxloopB test

- Beginning burst_maxloopC test

- Beginning burst_nstpushpop test

- Beginning burst_nestloop test

- Beginning burst_nestloop1 test

- Beginning burst_nestloop2 test

- Beginning burst_nestloop3 test

- Beginning burst_useloopB test

- Beginning burst_useloopC test

- Beginning burst_loop_init test

- Beginning burst_poploop test

- Beginning burst_nstpoploop test

- Beginning Exit Loop PG Opcodes test

- Beginning burst_exitloop test

- Beginning burst_cndexit test

- Beginning burst_ncndexit test

- Beginning burst_cndexitclr test

- Beginning burst_one Pat Gen, set_code

- Beginning Pat Gen, tl_PatgenClrCode

- Beginning burst_AAAA Pat Gen, set_code

- Beginning Pat Gen, clr_code

- Beginning burst_5555 Pat Gen, set_code

- Beginning Pat Gen, clr_code

- Beginning burst_zero Pat Gen, set_code

- Beginning Misc PG Opcodes test

- Beginning Halt End Module

- Beginning NOP End Module

- Beginning Fail Count

- Beginning Clear Fail

- Beginning Inhibit Fail Count

- Beginning Inhibit Cycle Count

- Beginning Mask

- Beginning Halt on Failure

- Beginning IGN Control Bit

- Beginning STV

- Finished on all slots

- Beginning StateBus Test test

- Statebus : Checking STB lines : Dual mode, 30MHz

- Statebus : Checking STB lines : Dual mode, 50MHz

- Statebus : Checking STB lines : Dual mode, 80MHz

- Statebus : Checking STB lines : Dual mode, 100MHz

- Statebus : Checking STB lines : Quad mode, 30MHz

- Statebus : Checking STB lines : Quad mode, 50MHz

- Statebus : Checking STB lines : Quad mode, 80MHz

- Statebus : Checking STB lines : Quad mode, 100MHz

- Statebus : Checking STB lines : Quad mode, 200MHz

- Statebus : Checking State number lines : Single mode, 25MHz

- Statebus : Checking State number lines : Single mode, 30MHz

- Statebus : Checking State number lines : Single mode, 50MHz

- Statebus : Checking State number lines : Quad mode, 50MHz

- Statebus : Checking State number lines : Quad mode, 100MHz

- Statebus : Checking State number lines : Quad mode, 150MHz

- Statebus : Checking State number lines : Quad mode, 200MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Single mode, 25MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Single mode, 30MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Single mode, 35MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Single mode, 50MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Dual mode, 35MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Dual mode, 50MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Dual mode, 80MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Dual mode, 100MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Quad mode, 50MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Quad mode, 100MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Quad mode, 150MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Quad mode, 200MHz

- Statebus : Checking STB lines : Dual mode, 30MHz

- Statebus : Checking STB lines : Dual mode, 50MHz

- Statebus : Checking STB lines : Dual mode, 80MHz

- Statebus : Checking STB lines : Dual mode, 100MHz

- Statebus : Checking STB lines : Quad mode, 30MHz

- Statebus : Checking STB lines : Quad mode, 50MHz

- Statebus : Checking STB lines : Quad mode, 80MHz

- Statebus : Checking STB lines : Quad mode, 100MHz

- Statebus : Checking STB lines : Quad mode, 200MHz

- Statebus : Checking State number lines : Single mode, 25MHz

- Statebus : Checking State number lines : Single mode, 30MHz

- Statebus : Checking State number lines : Single mode, 50MHz

- Statebus : Checking State number lines : Quad mode, 50MHz

- Statebus : Checking State number lines : Quad mode, 100MHz

- Statebus : Checking State number lines : Quad mode, 150MHz

- Statebus : Checking State number lines : Quad mode, 200MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Single mode, 25MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Single mode, 30MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Single mode, 35MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Single mode, 50MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Dual mode, 35MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Dual mode, 50MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Dual mode, 80MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Dual mode, 100MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Quad mode, 50MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Quad mode, 100MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Quad mode, 150MHz

- Statebus : Checking ADSS, MASK, CFAIL, FmtFAIL : Quad mode, 200MHz

- Finished StateBus Test on all slots

- Beginning StateBus Tset

- ...Testing Slot# 0 Tset Bit 0 <-> Tset# 1

- ...Testing Slot# 0 Tset Bit 1 <-> Tset# 2

- ...Testing Slot# 0 Tset Bit 2 <-> Tset# 4

- ...Testing Slot# 0 Tset Bit 3 <-> Tset# 8

- ...Testing Slot# 0 Tset Bit 4 <-> Tset# 16

- ...Testing Slot# 0 Tset Bit 5 <-> Tset# 32

- ...Testing Slot# 0 Tset Bit 6 <-> Tset# 64

- ...Testing Slot# 1 Tset Bit 0 <-> Tset# 1

- ...Testing Slot# 1 Tset Bit 1 <-> Tset# 2

- ...Testing Slot# 1 Tset Bit 2 <-> Tset# 4

- ...Testing Slot# 1 Tset Bit 3 <-> Tset# 8

- ...Testing Slot# 1 Tset Bit 4 <-> Tset# 16

- ...Testing Slot# 1 Tset Bit 5 <-> Tset# 32

- ...Testing Slot# 1 Tset Bit 6 <-> Tset# 64

- Finished StateBus Tset on all slots

- Beginning HRAM test

- HRAM Trigger tests

- HRAM Control - Checking triggering: trig cond - 1st parameter

- Testing Trigger On First Vector

- Testing Trigger On Fail Vector

- Testing Trigger on STV

- HRAM Control - Checking triggering: wait for event - 2nd parameter

- Testing Trigger On First Vector

- Testing Wait For Event

- HRAM Control - Checking triggering: Pretrig - 3rd parameter

- HRAM Control - Checking triggering: stops on full - 4th parameter

- HRAM Control - Checking capture

- Testing Capture All

- Testing Capture Fail

- Testing Capture STV

- Testing Capture Fail STV

- Testing Compress Repeats

- HRAM Override tests

- HRAM Control - Checking KeepAlive Override

- HRAM Control - Checking Priming & Flushing Override

- HRAM Control - Checking Repeat Override

- HRAM Trigger tests

- HRAM Control - Checking triggering: trig cond - 1st parameter

- Testing Trigger On First Vector

- Testing Trigger On Fail Vector

- Testing Trigger on STV

- HRAM Control - Checking triggering: wait for event - 2nd parameter

- Testing Trigger On First Vector

- Testing Wait For Event

- HRAM Control - Checking triggering: Pretrig - 3rd parameter

- HRAM Control - Checking triggering: stops on full - 4th parameter

- HRAM Control - Checking capture

- Testing Capture All

- Testing Capture Fail

- Testing Capture STV

- Testing Capture Fail STV

- Testing Compress Repeats

- HRAM Override tests

- HRAM Control - Checking KeepAlive Override

- HRAM Control - Checking Priming & Flushing Override

- HRAM Control - Checking Repeat Override

- Finished on HRAM Tests all slots

- Beginning Drive Compare Formats test

- Starting StartState OFF Tests, Single Mode

- Starting StartState NONE Tests, Single Mode

- Starting StartState FMT Tests, Single Mode

- Starting StartState HI/LO Tests, Single Mode

- Starting 40/60 Window Tests, Single Mode

- Starting 40/90 Window Tests, Single Mode

- Starting 20/60 Window Tests, Single Mode

- Starting Compare Valid Tests, Single Mode

- Starting Compare Midband Tests, Single Mode

- Starting Compare Hi Tests, Single Mode

- Starting Compare Low Tests, Single Mode

- Starting Compare Mask Tests, Single Mode

- Starting Compare Valid Tests, Dual Mode

- Starting Compare Midband Tests, Dual Mode

- Starting Compare Hi Tests, Dual Mode

- Starting Compare Low Tests, Dual Mode

- Starting Compare Mask Tests, Dual Mode

- Starting Compare Valid Tests, Quad Mode

- Starting Compare Midband Tests, Quad Mode

- Starting Compare Hi Tests, Quad Mode

- Starting Compare Low Tests, Quad Mode

- Starting Compare Mask Tests, Quad Mode

- Finished Drive Compare Formats Test on all slots

- Beginning Drive Compare Formats test

- Checking drive formats in single mode

- Checking drive formats in dual mode

- Checking drive formats in quad mode

- Finished on all slots

- Beginning Drive Compare Levels test

- Beginning Vih Test with level set to: 1.5 Volts

- Beginning Vih Test with level set to: 3 Volts

- Beginning Vih Test with level set to: 4.5 Volts

- Beginning Vih Test with level set to: 5.75 Volts

- Beginning Vil Test with level set to: -0.75 Volts

- Beginning Vil Test with level set to: 0.5 Volts

- Beginning Vil Test with level set to: 2 Volts

- Beginning Vil Test with level set to: 3.5 Volts

- Beginning Voh Test with level set to: +3.5 Volts

- Beginning Voh Test with level set to: +4.5 Volts

- Beginning Voh Test with level set to: +5.5 Volts

- Beginning Vol Test with level set to: +1.5 Volts

- Beginning Vol Test with level set to: +0.5 Volts

- Beginning Vol Test with level set to: -0.5 Volts.

- Finished Drive Compare Levels on all slots

- Beginning Levels Memory BIST

- Actual BIST Time for All boards = 0.15625secs

- Levels Memory BIST Passed on Slot: 0

- Levels Memory BIST Passed on Slot: 1

- Finished Levels Memory BIST on all slots

- Completed Channel_Board test on slot 1

 

%JOB_END - ****PASSED**** Channel_Board Quick Check of slot(s) 0, 1 at 12:03:10 PM

- PASS slot 0 (S/N XXX)

- PASS slot 1 (S/N XXX)

 

%JOB_START - Beginning DPS Quick Check test on slot 22 at 12:03:23 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_xxxE (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Verifying DPS Current Leakage

- Channel 0

- Channel 1

- Channel 2

- Channel 3

- Channel 4

- Channel 5

- Channel 6

- Channel 7

- Finished Verifying DPS Current Leakage

 

 

%JOB_END - ****PASSED**** DPS Quick Check of slot 22 (S/N:CXXXXX) at 12:03:26 PM

 

%JOB_START - Beginning ICUA Quick Check test on slot 2 at 12:03:38 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_xxxE (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- ICUA-2 P/N:51742601 Rev:738B S/N:XXXX

- %INFO -- ADM on ICUA-2 Chan0 Slot2, ADM P/N:51740520 Rev:735C S/N:

- %INFO -- ADM on ICUA-2 Chan1 Slot2, ADM P/N:51740520 Rev:735C S/N:40

- %INFO -- ADM on ICUA-2 Chan2 Slot2, ADM P/N:51740520 Rev:735C S/N:4

- %INFO -- ADM on ICUA-2 Chan3 Slot2, ADM P/N:51740520 Rev:735C S/N:40

- ICUA-2 Relay board P/N:51742800 Rev:515C S/N:4

 

- *** Start to test on Multi PC Environment ***

- [Check the existence of Giga-Channel on PCs]

- ImagePC#0

- [Overlap Check Giga-Channel NodeID on Image Processing PC]

 

- -- Check on Token Link Connection

- Starting PG_History_Ram

- Completed PG_History_Ram

- Starting PG_Svm_Ram

- Completed PG_Svm_Ram

- Starting PG_Scramble_Ram, ADSS

- Completed PG_Scramble_Ram

- Starting PG_Scramble_Ram, Tset

- Completed PG_Scramble_Ram

- Starting PG_LVM_BIST_Ram (up to 32 sec)

- Completed PG_LVM_BIST_Ram in 21.6 sec

 

- %INFO - LRS Off

- Starting TG Register Tests...

- Completed TG Register Tests

- Starting ICUA_TG_Period_Ram...

- Completed ICUA_TG_Period_Ram

- Starting ICUA_TG_Period_Map_Ram...

- Completed TG_Period_Map_Ram

- Starting TG_LVM_BIST_Ram (up to 32 sec)

- Completed TG_LVM_BIST_Ram in 10.8 sec

- Starting ICUA_TG_History_Ram

- Completed ICUA_TG_History_Ram

- Starting ICUA_TG_SVM_Ram

- Completed ICUA_TG_SVM_Ram

- Starting ICUA_TG_ADSS_Ram

- Completed ICUA_TG_ADSS_Ram

- Starting ICUA_TG_KeepAlive_Ram

- Completed ICUA_TG_KeepAlive_Ram

- Starting ICUA_TG_Tset_LkDwn_Ram

- Completed ICUA_TG_Tset_LkDwn_Ram

- Starting ICUA_TG_Edge_Ram

- Completed ICUA_TG_Edge_Ram

- Starting ICUA_TG_Format_Ram

- Completed ICUA_TG_Format_Ram

- Starting ICUA_TG_FormatLkDwn_Ram

- Completed ICUA_TG_FormatLkDwn_Ram

- %INFO - LRS On

 

- Starting ICUA MEM & MOV FPGA Registers...

- [ICUA Global IDL Register Check]

- [ICUA Channel Select IDL Register Check - Chan0]

- [Data Transfer and Giga Channel Control Register Check - Chan0]

- [ICUA Channel Select IDL Register Check - Chan1]

- [Data Transfer and Giga Channel Control Register Check - Chan1]

- [ICUA Channel Select IDL Register Check - Chan2]

- [Data Transfer and Giga Channel Control Register Check - Chan2]

- [ICUA Channel Select IDL Register Check - Chan3]

- [Data Transfer and Giga Channel Control Register Check - Chan3]

- [Data Transfer and Giga Channel Control Register Check]

- Completed ICUA MEM & MOV FPGA Registers

 

- Starting PPMU FPGA Registers

- Completed PPMU FPGA Registers

 

- Start Thermosensor Check...

- Completed Thermosensor Check

 

- Start ICUA board SDRAM/SVM Quick Check

- Start ICUA SDRAM Check...

- [Data Uniqueness Test]

- [Address Uniqueness Test]

- [Data Dump Test(1K)]

- Completed ICUA SDRAM Check

- Start ICUA SVM Check...

- [Data Uniqueness Test]

- [Address Uniqueness Test]

- [Data Dump Test(1K)]

- Completed ICUA SVM Check

- Completed ICUA board SDRAM/SVM Quick check

 

- Start ICUA board Download check...

- [1k words Download check]

- [Download SDRAM source address uniqueness check]

- [Download SVM destination address uniqueness check]

- [Up to 1k words Download check]

- Completed ICUA board Download check

 

- Start ICUA_ADC_DAC Check...

- [A/D Converter Ground Source Measure Test]

- [RefDAC Voltage Test Measured by ADC on ICUA]

- [PPMU DAC Voltage Test Measured by ADC on ICUA]

- Completed ICUA_ADC_DAC Check

 

- Start ICUA Utility Bit Check...

- Completed ICUA Utility Bit Check

 

- Starting State Bus test

- Statebus : Checking STB lines : Normal mode, 30MHz

- Statebus : Checking STB lines : Normal mode, 50MHz

- Statebus : Checking STB lines : Normal mode, 80MHz

- Statebus : Checking STB lines : Normal mode, 100MHz

- Statebus : Checking State number lines : Extended mode, 25MHz

- Statebus : Checking State number lines : Extended mode, 30MHz

- Statebus : Checking State number lines : Extended mode, 50MHz

- Completed State Bus test

 

- Start Capture Test [Checker Mode]...

- [Capture Test]

- [Capture Test(All Channel Capture)]

- [Accumulate Test]

- Completed Capture Test [Checker Mode]

 

- Start ADM Quick Check...

- [Check ADM at ICUA Chan 0]

- [ADM Power Supply Voltage Check]

- [ADM Capture Bank check]

- [Offset Adjust check] (ADM 50M-A/D Converter Capture)

- [Offset Adjust check] (ADM 25M-A/D Converter Capture)

- [Input Voltage Range Test]

- [ADM Post-CDS Amp check]

- [ADM OffsetRemover Dac check]

- [ADM Optical Black Remover Dac check]

- [Differential Terminate Path Test]

- [Check ADM at ICUA Chan 1]

- [ADM Power Supply Voltage Check]

- [ADM Capture Bank check]

- [Offset Adjust check] (ADM 50M-A/D Converter Capture)

- [Offset Adjust check] (ADM 25M-A/D Converter Capture)

- [Input Voltage Range Test]

- [ADM Post-CDS Amp check]

- [ADM OffsetRemover Dac check]

- [ADM Optical Black Remover Dac check]

- [Differential Terminate Path Test]

- [Check ADM at ICUA Chan 2]

- [ADM Power Supply Voltage Check]

- [ADM Capture Bank check]

- [Offset Adjust check] (ADM 50M-A/D Converter Capture)

- [Offset Adjust check] (ADM 25M-A/D Converter Capture)

- [Input Voltage Range Test]

- [ADM Post-CDS Amp check]

- [ADM OffsetRemover Dac check]

- [ADM Optical Black Remover Dac check]

- [Differential Terminate Path Test]

- [Check ADM at ICUA Chan 3]

- [ADM Power Supply Voltage Check]

- [ADM Capture Bank check]

- [Offset Adjust check] (ADM 50M-A/D Converter Capture)

- [Offset Adjust check] (ADM 25M-A/D Converter Capture)

- [Input Voltage Range Test]

- [ADM Post-CDS Amp check]

- [ADM OffsetRemover Dac check]

- [ADM Optical Black Remover Dac check]

- [Differential Terminate Path Test]

- Completed ADM Quick Check

 

 

- == Running with Image Processing PC(IMGPC0) for Data Transfer Tests ==

- Start ICUA board Giga Channel data transfer check...

- [Acquire function check without averaging]

- 32-bit data transfer check

- [Acquire function check with averaging]

- -- 16bit GAIN bit check

- -- 24bit data divide check

- Completed ICUA board Giga Channel data transfer check

 

- Start APC-485T FIFO Check ...

- [Memory Size: 16777216 Bytes]

- Completed APC-485T FIFO Check

 

- Start APM-425T CheckSum Bit Check...

- 32-bit data transfer and all checksum bit check

- Completed APM-425T CheckSum Bit Check...

 

- Completed ICUA Quick Check 68.3 sec

 

%JOB_END - ****PASSED**** ICUA Quick Check of slot 2 (S/N:) at 12:04:46 PM

 

%JOB_START - Beginning APMU Quick Check test on slot 5 at 12:04:59 PM on 1/17/2020

Workbook Rev V7.60.40IP02 DC1116 IG-XL Version: 3.50.40IP02 DIB: P/N 51745600

S/N xxx Rev 0901A

 

%INFO - -----------------------------------------------------------------------

%INFO - System IP750_xxxE (IP750EX)

%INFO - IG-XL 3.50.40IP02, Build: 04.13.11.20.00

%INFO - Maintenance 7.60.40IP02, Build: 04.18.11.02.09

%INFO - -----------------------------------------------------------------------

- Starting APMU PG test

- Starting PG_History_Ram

- Completed PG_History_Ram

- Starting PG_Svm_Ram

- Completed PG_Svm_Ram

- Starting PG_Scramble_Ram, ADSS

- Completed PG_Scramble_Ram

- Starting PG_Scramble_Ram, Tset

- Completed PG_Scramble_Ram

- Starting PG_LVM_BIST_Ram (up to 32 sec)

- Completed PG_LVM_BIST_Ram in 21.6 sec

- Completed APMU PG test

-

- Starting APMU IDPROM test

- APMU Mother Board - P/N:51740001 Rev:1012A S/N: 4

- APMU Relay Board - P/N:51740200 Rev:2060 S/N: 25

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 250

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 2508

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 250

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 24

- APMU Rider Board - P/N:51740100 Rev:5200 S/N: 25

- Completed APMU IDPROM test

-

- Starting APMU Register test

- Starting APMU Misc FPGA Register test

- Completed APMU Misc FPGA Register test

- Starting APMU Control FPGA Register test

- Completed APMU Control FPGA Register test

- Completed APMU Register test

-

- Starting APMU Thermal meter test

- Completed APMU Thermal meter test

-

- Starting APMU Voltages test

- Completed APMU Voltages test

-

- Start APMU Reference DAC test

- Complete APMU Reference DAC test

-

- Starting APMU Relay test

- Starting -VMBUS_H- test

- Completed -VMBUS_H- test

- Starting -VMBUS_L- test

- Completed -VMBUS_L- test

- Starting -CALBUS_HS- test

- Completed -CALBUS_HS- test

- Starting -CalBUS resistor- test

- Completed -CalBUS resistor- test

- Completed APMU Relay test

 

- Starting APMU Analog function test

- Starting -Gate Control- test

- Completed -Gate Control- test

- Starting -Parallel Site- test

- Completed -Parallel Site- test

- Starting -Differential Voltage Meter- test

- Completed -Differential Voltage Meter- test

- Starting -MV mode- test

- Completed -MV mode- test

- Starting -FV mode- test

- Completed -FV mode- test

- Starting -MI mode- test

- Completed -MI mode- test

- Starting -FI mode- test

- Completed -FI mode- test

- Starting -Clamp I mode- test

- Completed -Clamp I mode- test

- Starting -Clamp V mode- test

- Completed -Clamp V mode- test

- Starting -Gang_FV(8ch) mode- test

- Completed -Gang_FV(8ch) mode- test

- Starting -Gang_FI(8ch) mode- test

- Completed -Gang_FI(8ch) mode- test

- Completed APMU Analog function test

%JOB_END - ****PASSED**** APMU Quick Check of slot 5 (S/N:40) at 12:05:43 PM

 


Get Quote



Not the item you were looking for?

Ask SDI fabsurplus.com!

If you are looking for a specific piece of semiconductor equipment let us know what type of semiconductor manufacturing equipment you would like to buy, and we will conduct a search for what you are looking for.

Inquiry

The data provided herein is not an offer capable of acceptance.
The information contained on this page is, to our knowledge and information, accurate, but it may contain errors and therefore we do not warrant the completeness or accuracy of the information contained on this page.
Any offer by you to purchase the equipment described on this page shall be subject to our standard terms and conditions of sale.

sdi logo

SDI-Fabsurplus has worked with determination and tenacity over the last 25 years to develop one of the largest semiconductor equipment databases and the best software.

We strive to provide our customers with the best equipment at the lowest prices using our unparalleled network of industry contacts.

We are truely devoted to become your professional , customer-oriented , efficient and value-for-money semiconductor equipment and parts source.

Read more about us






View all TEST ATE for sale

Search for TERADYNE items for sale

Search for IP750EX items for sale


Ask SDI fabsurplus.com! If you can't find what you need, or are looking for a specific piece of semiconductor equipment. Let us know what type of semiconductor manufacturing equipment you would like to buy, and we will conduct a search for what you are looking for.

Inquiry



sdi logo

Click here for all contact information.
SDI-Fabsurplus Srl Italy.




SDI fabsurplus.com works by using the latest technology to continuously monitor the used equipment market place.
If you want to join our mailing list, please send click on the button below to send an e-mail to subscribe to our monthly equipment news update.

Request monthly equipment news





We'd love to get your feedback about our website and our services! If you can think of ways we can improve or other services you need, please feel free to send details.

Feedback Form